Planning application
29 Queen Anne Street London W1G 9HU
Works: Windows or glazing
Relates to 25/04705/FULL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of a window on the rear elevation with a door and internal alterations, including installation of a slab and alterations to floor structure at lower ground floor level and installation of partions at second and third floor levels. (Linked with 25/04705/FULL)
As published by the council, reference 25/04706/LBC
Application record
- Reference
- 25/04706/LBC
- Type
- Listed Building Consent Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 9 Jul 2025
- Validated
- 14 Jul 2025
- Decided
- 24 Feb 2026
- Ward
- Marylebone
- Decision by
- Delegated Decision
- Postcode
- W1G 9HU
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
25/04705/FULL Granted
29 Queen Anne Street London W1G 9HU
Replacement of a window on the rear elevation with a door. (Linked with 25/04706/LBC)
Timeline
Dates from the published record
-
9 Jul 2025
Received by Westminster
-
14 Jul 2025
Validated
Checked as complete and ready for consideration.
-
24 Feb 2026
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
25/04705/FULL Granted
29 Queen Anne Street London W1G 9HU
Replacement of a window on the rear elevation with a door. (Linked with 25/04706/LBC)
1 later application on the register refers to this one:
-
25/04705/FULL Granted
29 Queen Anne Street London W1G 9HU
Replacement of a window on the rear elevation with a door. (Linked with 25/04706/LBC)
Who's behind it
Company information only, from the register and Companies House
Backyards Design Studios Ltd Agent, a design practice
8 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
50 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 24 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
29 Queen Anne Street London W1G 9HU
Replacement of a window on the rear elevation with a door. (Linked with 25/04706/LBC)
Granted Full applications Windows or glazing 50 docs -
14 Wigmore Place London W1U 2LX
Replacement of front entrance door; installation of insulation to external walls; removal of an existing partition between the lounge and kitchen and replacement of internal doors; installation of slim line glazing to existing windows; new window to the rear first floor; replacement of rooflight and strengthening works to the buildings structure. (Linked with 25/06647/FULL)
Granted Heritage and listed buildings Loft or dormer Windows or glazing 24 docs -
14 Wigmore Place London W1U 2LX
Replacement of front entrance door; installation of insulation to external walls; removal of an existing partition between the lounge and kitchen and replacement of internal doors; installation of slim line glazing to existing windows; new window to the rear first floor; replacement of rooflight and strengthening works to the buildings structure. (Linked with 25/06648/LBC)
Granted Full applications Loft or dormer Windows or glazing 23 docs -
23 Queen Anne Street London W1G 9HN
88% historically approved · decision due ~24 Mar
Installation of photovoltaic panels (PV) at main roof level.
Awaiting decision Full applications 14 docs -
30 Queen Anne Street London W1G 8HX
Erection of an infill extension at basement and ground floor level, Installation of a new dormer on top of the rear closet wing to facilitate a light overrun, erection of a single storey extension at first floor level to the rear of the property and installation of railing on the eastern boundary of the site to facilitate the use of flat roof at first floor level as a terrace. All to provide enhanced office accommodation (Class E)
Refused Full applications Extension Loft or dormer 29 docsSmall domestic -
37 Harley Street London W1G 8QG
88% historically approved · decision due ~23 Jul
Installation of two air condenser units within acoustic enclosure to front lightwell. (Linked with 26/03518/LBC)
Awaiting decision Full applications 8 docs
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.