Planning application
46 Eaton Place London SW1X 8AL
Works: Extension Loft or dormer Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of extensions at rear lower-ground, ground, first and second floor levels with roof terrace at rear first floor level; replacement mansard roof and facade alterations to mews building; basement extension; roof terrace, plant enclosure and lift overrun at main roof level. Change of use from embassy to two dwellings (Site includes 20 Eaton Mews North).
As published by the council, reference 25/04439/FULL
Application record
- Reference
- 25/04439/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Application Permitted
- Received
- 27 Jun 2025
- Validated
- 27 Jun 2025
- Decided
- 17 Mar 2026
- Ward
- Knightsbridge & Belgravia
- Decision by
- Complex Delegated Decision
- Postcode
- SW1X 8AL
Timeline
Dates from the published record
-
27 Jun 2025
Received by Westminster
-
17 Mar 2026
Decision issued: Application Permitted
-
30 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
916 applications on PlanIndex · across 112 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
144 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
46 Eaton Place London SW1X 8AL
Confirmation that the planning permission dated 26th April 2023 (RN: 22/05260/FULL) for the 'Use of existing buildings as two separate dwellings with associated alterations and extensions, including new rear courtyard with green living wall at lower ground and ground floor levels, creation of roof terraces at rear upper ground floor and main roof levels, alterations to terrace at first floor level, replacement rear closet wing extension at first and second floor levels, replacement of mansard roof, and replacement of windows and doors on all elevations (site includes 20 Eaton Mews North)' was lawfully implemented prior to the expiration date and that it is lawful to complete the outstanding works.
Granted Lawful development Extension Loft or dormer +1 13 docs -
46 Eaton Place London SW1X 8AL
Erection of extensions at rear lower-ground, ground, first and second floor levels with roof terrace at rear first floor level; replacement mansard roof and facade alterations to mews building; basement extension; roof terrace, plant enclosure and lift overrun at main roof level; and associated internal alterations including to plan form and provision of lift (Site includes 20 Eaton Mews North). (Linked with 25/04439/FULL)
Granted Heritage and listed buildings Extension Loft or dormer 122 docs -
52 Eaton Place London SW1X 8AL
90% historically approved · decision due ~28 May
Detailed elevations and section of the front door and its surrounds, pursuant to condition 4 of Listed Building Consent dated 25th September 2025 (25/05109/LBC)
Awaiting decision Conditions 4 docs -
52 Eaton Place London SW1X 8AL
87% historically approved · decision due ~8 Jan
Details of the front door pursuant to Condition 4 of planning permission dated 25th September 2025 (RN: 25/05108/FULL).
Awaiting decision Full applications 6 docs -
52 Eaton Place London SW1X 8AL
92% historically approved · decision due ~14 Oct
Amendments to planning permission dated 25 September 2025 (25/05108/FULL) for: Alterations to rear extension at first floor level including creation of rear roof terrace at second floor level; replacement of first and second floor level front windows with double glazed timber sash windows; replacement of front door; reinstatement of period windows and doors namely, to allow replacement of second floor rear full height sash window with set of french doors.
Awaiting decision Amendments Extension Windows or glazing -
52 Eaton Place London SW1X 8AL
Alterations to rear extension at first floor level including creation of rear roof terrace at second floor level; replacement of first and second floor level front windows with double glazed timber sash windows; replacement of front door; reinstatement of period windows and doors to first floor flat, second floor flat, and the common parts; and, internal alterations to the first floor flat, second floor flat, and common parts.
Granted Heritage and listed buildings Extension Windows or glazing 35 docs
Other full applications applications
In Westminster
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05900/FULL Awaiting decision
68 Edgware Road London W2 2EG
Installation of an access hatch window within an existing door to the sites rear elevation fronting Stourcliffe Street to facilitate takeaway collections via Deliveroo from the restaurant. (68-74 Edgware Road).
-
26/05907/FULL Awaiting decision
St Augustines Primary School Kilburn Park Road London NW6 5XA
Installation of district heating network pipework (Phase 1) and installation of individual building connection pipework and associated Glass Reinforced Plastic (GRP) cabinets in connection with the proposed South Kilburn District Heating Network, including associated external and internal works.
-
26/05914/FULL Awaiting decision
66 - 68 Brewer Street London W1F 9TP
Installation of a retractable Dutch-style awning/canopy above the existing Brewer Street doorway. (NB: Venue NAME on canopy, subject to separate advert application.)
-
26/05899/FULL Awaiting decision
Flat 6 39 Wimpole Street London W1G 8YE
Replacement of a painted timber roof top roof light to match existing. (Linked with26/05602/LBC)