Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 6 74 Portland Place London W1B 1NR

Granted Westminster 23/04087/FULL Full Planning Permission Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of existing roof lanterns with skylights.

As published by the council, reference 23/04087/FULL

Application record

Reference
23/04087/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
16 Jun 2023
Validated
16 Jun 2023
Decided
7 Aug 2023
Ward
West End
Decision by
Delegated Decision
Postcode
W1B 1NR

Timeline

Dates from the published record

  1. 16 Jun 2023

    Received by Westminster

  2. 7 Aug 2023

    Decision issued: Application Permitted

  3. 14 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 7 August 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Royal Institute Of British Architects 66 Portland Place London W1B 1AD

    25/05501/ADLBC Submitted 4 Aug 2025 50 yards away

    Details of Fire Safety Works in part pursuant to condition 8 of listed building consent dated 11 June 2025 (ref. 25/01205/LBC).

    Granted Conditions 6 docs
  • Royal Institute Of British Architects 66 Portland Place London W1B 1AD

    25/07571/ADLBC Submitted 20 Oct 2025 50 yards away

    Details of new external fire escape, new pavement lights and supporting structure in the Weymouth Street lightwell, new or adjusted balustrades and railings, new guardrail and glass balustrade, new bronze grilles in the Florence Hall floor, alterations to the stage in the Jarvis Hall pursuant to Conditions 7 (Parts 4, 5, 6, 11, 12 and 13) of listed building consent dated 11 June 2025 (RN: 25/01205/LBC)

    Granted Conditions 7 docs
  • Royal Institute Of British Architects 66 Portland Place London W1B 1AD

    26/02506/ADLBC Submitted 16 Apr 2026 50 yards away

    89% historically approved · decision due ~11 Jun

    Detailed drawings of the new or adjusted ceilings pursuant to condition 7 (15) of listed building dated 11th June 2025 (RN:25/01205/LBC)

    Awaiting decision Conditions 11 docs
  • Royal Institute Of British Architects 66 Portland Place London W1B 1AD

    26/01923/ADLBC Submitted 24 Mar 2026 50 yards away

    89% historically approved · decision due ~3 Jun

    Detailed drawings of the a plan to show the building's areas of high significance and details of the position, type, and method of installation of services and related fixtures, including any fire safety works, in areas designated as "high significance", with particular regard to the Jarvis and Florence Hall, Main Foyer and Central Staircase pursuant to condition 8 of planning permission dated 11th June 2025 (RN:25/01205/LBC)

    Awaiting decision Conditions 29 docs
  • Royal Institute Of British Architects 66 Portland Place London W1B 1AD

    25/07253/ADLBC Submitted 7 Oct 2025 50 yards away

    Details of a plan to show the building's areas of high significance and method of installation of services and related fixtures, including any fire safety works, in areas designated as "high significance", with particular regard to the Jarvis and Florence Hall, Main Foyer and Central Staircase pursuant to Condition 8 (part) of the listed building consent dated 11 June 2025 (RN:25/01205/LBC).

    Granted Conditions 58 docs
  • Royal Institute Of British Architects 66 Portland Place London W1B 1AD

    26/01325/ADFULL Submitted 3 Mar 2026 50 yards away

    88% historically approved · decision due ~28 Apr

    Details of the new or adjusted balustrades and railings pursuant to Condition 16 (Part 6) of planning permission dated 11 June 2025 (RN 25/01204/FULL).

    Awaiting decision Full applications 11 docs

In Westminster

  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07470/FULL Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement. (Linked with 26/07471/LBC).

    Received 3 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07466/FULL Awaiting decision

    65 Albion Gate Albion Street W2 2LA

    Replacement of first-floor front elevation windows and balcony door with double-glazed steel-framed units.

    Received 3 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07460/FULL Awaiting decision

    1 Hanover Square London W1S 1HA

    Installation of new public art sculptures and seating; hard and soft landscaping; installation of an area of raised terrace decking on St George Street measuring 43m x 2.6m for the placing of tables, chairs and banquette benches in connection with restaurant use; and associated external alterations and enabling works.

    Received 3 Nov, published by the council 5 Nov 2026 Full applications