Planning application

Basement Floor And Ground Floor 19 Wigmore Street London W1U 1PH

Granted Westminster 22/05404/ADFULL Approval of Details (Full PP)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of waste storage and cycle parking pursuant to Conditions 3 and 4 of planning permission dated 08 June 2022 (RN:22/02645/FULL)

As published by the council, reference 22/05404/ADFULL

Application record

Reference
22/05404/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Application Permitted
Received
8 Aug 2022
Validated
8 Aug 2022
Decided
25 Aug 2022
Ward
West End
Decision by
Delegated Decision
Postcode
W1U 1PH

Timeline

Dates from the published record

  1. 8 Aug 2022

    Received by Westminster

  2. 25 Aug 2022

    Decision issued: Application Permitted

  3. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

6 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Basement And Ground Floor 23 Wigmore Street London W1U 1PL

    22/05267/ADV Submitted 2 Aug 2022 5m away

    Display of internally illuminated fascia sign measuring 0.29m x 17.1m and display of two non illuminated fascia signs measuring 1.65m x 2.15m and 1.77 m x 2.15 m and display of one logo measuring 0.7 m x 0.7m

    Granted Advertising 13 docs
  • Cavendish Court 11 - 15 Wigmore Street London W1U 1PF

    03/08496/AD7 Submitted 4 Nov 2003 23m away

    Display for a temporary period of six months of a non-illuminated 'to let' board located on the face of the building at a height of between 3m and 4.6m above pavement level and measuring 1.2m x 0.9m.

    Granted Advertising 2 docs
  • 24 Wigmore Street London W1U 2RJ

    25/08765/LBC Submitted 2 Dec 2025 36m away

    Relocation of external plant from ground to basement level and associated works. (Linked to 25/08764/FULL)

    Granted Heritage and listed buildings 9 docs
  • 24 Wigmore Street London W1U 2RJ

    25/08764/FULL Submitted 2 Dec 2025 36m away

    Relocation of external plant from ground to basement level and associated works. (Linked to 25/08765/LBC)

    Granted Full applications 12 docs
  • 12 - 14 Wigmore Street London W1U 2RE

    26/05089/AD7 Submitted 29 Jul 2026 41m away

    89% historically approved · decision due ~23 Sep

    Display for a temporary period of six months of a non-illuminated 'to let' board located on the face of the building at a height of between 3m and 4.6m above pavement level and measuring 1.2m x 0.9m.

    Decided
  • 8 Wigmore Street London W1U 2RD

    25/08995/FULL Submitted 11 Dec 2025 51m away

    87% historically approved · decision due ~5 Feb

    Installation of a new extract duct on the rear elevation of the building to terminate at roof level in connection to the Class E restaurant use at lower ground and ground floor level.

    Awaiting decision Full applications 16 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications