Skip to content
PlanIndex Get alerts
Menu

Planning application

18 Ennismore Mews London SW7 1AN

Granted Westminster 22/05347/NMA Non-material amendments

Works: Extension Loft or dormer Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amendments to planning permission 31st August 2021 (RN: 21/00759/FULL) Demolition and redevelopment of an existing single-family dwelling behind a retained and altered facade including a new second floor mansard roof extension. Namely, removal of proposed chimney stack, new rainwater pipe added to front elevation and new access hatch added to rear elevation to carry out essential roof maintenance and cleaning when required.

As published by the council, reference 22/05347/NMA

Application record

Reference
22/05347/NMA
Type
Non-material amendments
Status
Decided
Decision
Granted As published: Application Permitted
Received
5 Aug 2022
Validated
5 Aug 2022
Decided
15 Aug 2022
Ward
Knightsbridge & Belgravia
Decision by
Delegated Decision
Postcode
SW7 1AN

Timeline

Dates from the published record

  1. 5 Aug 2022

    Received by Westminster

  2. 15 Aug 2022

    Decision issued: Application Permitted

  3. 20 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

RBD Architecture & Interiors Agent, an architecture practice

5 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 15 August 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Flat 8 58 Rutland Gate London SW7 1PL

    25/05311/FULL Submitted 30 Jul 2025 50 yards away

    Replacement of the third floor central front window at 57 with single glazed sash window. (Linked with RN: 25/05312/LBC)

    Granted Full applications Windows or glazing 19 docs
  • Flat 19 58 Rutland Gate London SW7 1PL

    25/06044/LBC Submitted 25 Aug 2025 50 yards away

    Internal alterations at first floor level comprising the insertion of a new W.C off the main entrance hall.

    Granted Heritage and listed buildings 16 docs
  • Flat 8 58 Rutland Gate London SW7 1PL

    25/05312/LBC Submitted 30 Jul 2025 50 yards away

    Replacement of the third floor central front window at 57 with single glazed sash window and internal alterations, including removal and installation of partitions and replacement floor finishes. (Linked with RN: 25/05311/FULL)

    Granted Heritage and listed buildings Windows or glazing 14 docs
  • 29 Ennismore Mews London SW7 1AP

    26/02233/NMA Submitted 2 Apr 2026 50 yards away

    93% historically approved · decision due ~10 Jun

    Amendments to planning permission dated 19th March 2025 (RN 24/08165/FULL) for the Excavation of basement; erection of mansard roof extensions, including plant equipment in recesses; alterations to front and side elevations, including new and replacement windows and doors; all in connection with use as two residetail units. (Site includes Nos 29 & 29A Ennismore Mews.) NAMELY, render over the brickwork; Reinstate and enlarge the northernmost window on the first floor; Shift the dormer windows slightly from the approved position and adjust the other windows marginally to better balance the composition and to correspond with the internal layout; Enlarge the middle window on ground floor at 29A; and Shift entry door at 29 and enlarge entrance at 29A.

    Awaiting decision Amendments Extension Loft or dormer +1 18 docs
  • 29 Ennismore Mews London SW7 1AP

    26/02196/ADFULL Submitted 1 Apr 2026 50 yards away

    88% historically approved · decision due ~10 Jun

    Details of Code of Construction Practice pursuant to condition 3 of planning permission dated 20th March 2025 (RN:24/08165/FULL)

    Awaiting decision Full applications 9 docs
  • 29 Ennismore Mews London SW7 1AP

    26/05410/FULL Submitted 10 Aug 2026 50 yards away

    88% historically approved · decision due ~14 Oct

    External alterations to Nos. 29 and 29A Ennismore Mews, including erection of mansard extension to no.29 and alterations/ replacement of mansard to no.29A, alterations to front facade of 29 and 29A; installation of new window to side elevation at first floor level and alterations rooflights; installation and repositioning of CCTV cameras; relocation of air-conditioning condenser units to main roof level with associated acoustic screening and anti-vibration measures.

    Awaiting decision Full applications Extension Loft or dormer +1

In Westminster

  • 26/07243/NMA Awaiting decision

    144 Praed Street London W2 1HU

    Amendments to planning permission dated 09 August 2024 (RN: 22/08247/FULL) for the replacement of the mansard roof with a sheer brickwork extension, new mansard roof extension and rooftop plant enclosure to provide additional hotel accommodation (Class C1); alterations to facade fenestration and shopfronts; installation of a green wall to the side (north-east); and associated works. NAMELY, to amend Condition 13 to require details of the modular green wall to be submitted prior to commencement of the relevant part of the development.

    Received 22 Oct, published by the council 26 Oct 2026 Amendments
  • 26/07181/NMA Awaiting decision

    Newlands House 37 - 40 Berners Street London W1T 3NA

    Amendments to planning permission dated 9th October 2025 (RN:25/04048/FULL) forInfilling of the ground floor undercroft along Mortimer Street (Class E), replacement of ground floor frontage to the whole building and refurbishment of the upper floor facades. Namely, alterations to the approved green roof area at the site.

    Received 21 Oct, published by the council 22 Oct 2026 Amendments
  • 26/07132/NMA Awaiting decision

    157 - 159 Victoria Street London SW1E 5NA

    Amendments to planning permission dated 27 August 2026 (RN: 26/04666/FULL) for the: Installation of combined defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch. NAMELY, to allow alteration to design of combined defibrillator and bleed kit cabinet.

    Received 19 Oct, published by the council 20 Oct 2026 Amendments
  • 26/07086/NMA Awaiting decision

    Windsor House 50 Victoria Street London SW1H 0TL

    Amendments to planning permission dated 18th September 2026 (RN 26/01445/FULL) for the Refurbishment of Windsor House and Christchurch House (excluding residential part), including re-cladding and amendment of facades, replacement of windows, new end-of-trip facilities, installation of roof-level plant and screening, and associated works, to provide office, retail, restaurant and indoor recreation accommodation (Class E) with amenity spaces, including a new roof level pavilion to Christchurch House and link bridge between Windsor House and Christchurch House. NAMELY, amendments to the wording of Conditions 1, 11, 12, 13,14, 15 and 26.

    Received 16 Oct, published by the council 20 Oct 2026 Amendments
  • 26/07071/NMA Awaiting decision

    London School Of Economics & Political Science Houghton Street London WC2A 2AE

    Amendments to planning permission dated 21st Februrary 2018 (RN:17/05855/FULL) for Variation of Condition 1 of planning permission dated 19 October 2016 (RN:16/05155/FULL) for demolition of existing buildings known as Clare Market, The Anchorage, the East Building, St Clements (partial) and Tower One (partial) and redevelopment to provide replacement interconnected academic facilities for Class D1 and ancillary uses, comprising a two storey basement, a part six storey / part 13 storey building and a seven storey core extension to the St Clements building and associated cycle parking and other works; all arranged around a new public square namely, removal of two cycle stands.

    Received 15 Oct, published by the council 16 Oct 2026 Amendments