Planning application
22/03311/FULL
108 Westbourne Park Road London W2 5PL
Proposal
Replacement of door to the front elevation at lower ground floor level; replacement conservatory and associated alterations to garden; replacement of all windows with double glazed windows; replacement of railing on the left hand side of the front entrance with a taller railing. Installation of air condenser unit within acoustic enclosure within rear garden.
As published by the council, reference 22/03311/FULL
Timeline
Dates from the published record
-
17 May 2022
Received by Westminster
-
31 May 2022
Validated
Checked as complete and ready for consideration.
-
1 Aug 2022
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/09107/FULL Awaiting decision
Flat 4 4 St Stephen's Gardens London W2 5QX
Removal of existing butterfly roof, Raising of existing party walls for loft extension structure, Erection of a mansard roof extension to create open plan living and kitchen space, New roof terrace behind the front parapet, New rooflight over the stair.
-
26/02132/FULL Awaiting decision
68 Westbourne Park Villas London W2 5EB
Installation of larger rooflight in eastern roof slope as amendment to rooflight permitted by (RN 25/00245/FULL)
-
26/04468/FULL Awaiting decision
68 Westbourne Park Villas London W2 5EB
Variation of condition 1 of planning permission dated 18 March 2025 (RN: 25/00245/FULL) for the: Replacement of roof and erection of rear dormer, alterations to fenestration to lower front, installation of plant within enclosure at roof level, and associated alterations (Retrospective application). Namely, to allow enlarged rooflight on eastern roof slope.
-
26/01256/FULL Awaiting decision
78 Westbourne Park Road London W2 5PL
Erection of rear extension at ground floor level with green roof and skylight; renovation of existing side extension with green roof and skylights; new glazed sash window in front elevation of side extension; second sash window within the same elevation to bricked-in window; demolition and re-build of brick boundary wall along Westbourne Park Passage.
-
26/03260/FULL Awaiting decision
66 - 68 Westbourne Park Road London W2 5PJ
Erection of a single-storey rear extension, including excavation to provide a basement, together with associated landscaping works.
-
25/07610/FULL Awaiting decision
Flat 2 104 Chepstow Road London W2 5QS
Installation of roof terrace, with access through existing roof light.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.