Skip to content
PlanIndex Get alerts
Menu

Planning application

17 Harley Street London W1G 9QH

Refused Westminster 19/03481/ADFULL Approval of Details (Full PP)

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Details of quench pipe enclosure pursuant to condition 19 of planning permission dated 15 March 2019 (RN: 18/10358/FULL).

As published by the council, reference 19/03481/ADFULL

Application record

Reference
19/03481/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Application Refused
Received
8 May 2019
Validated
8 May 2019
Decided
3 Jun 2019
Ward
Marylebone High Street
Decision by
Delegated Decision
Postcode
W1G 9QH

Site history

Applications at this address on the Westminster register

This site has had 6 applications since 2018: 3 approved, 2 refused.

  • 19/04786/ADLBC Granted

    17 Harley Street London W1G 9QH

    Details of quench pipe enclosure pursuant to condition 7 of listed building consent dated 15 March 2019 (RN: 18/10359/LBC);

    Decided 1 Jul 2019 Conditions
  • 19/04785/ADFULL Granted

    17 Harley Street London W1G 9QH

    Details of quench pipe enclosure pursuant to condition 19 of planning permission dated 15 March 2019 (RN: 18/10358/FULL)

    Decided 1 Jul 2019 Full applications
  • 19/03483/ADLBC Refused

    17 Harley Street London W1G 9QH

    Details of quench pipe enclosure pursuant to condition 7 of listed building consent dated 15 March 2019 (RN: 18/10359/LBC).

    Decided 3 Jun 2019 Conditions
  • 19/02078/ADFULL Granted

    17 Harley Street London W1G 9QH

    Details of Appendix A of the Code of Construction Practice and Construction Management Plan pursuant to condition 10 of planning permission dated: 15 March 2019 (RN: 18/10358/FULL)

    Decided 28 Mar 2019 Full applications
  • 18/05529/LBC Withdrawn

    17 Harley Street London W1G 9QH

    Internal and external alterations including further excavation of basement beneath mews house, alterations to windows and doors and reinstatement of two historic ceilings.

    Decided 3 Sep 2018 Heritage and listed buildings

Timeline

Dates from the published record

  1. 8 May 2019

    Received by Westminster

  2. 3 Jun 2019

    Decision issued: Application Refused

  3. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

10 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this refusal means

Westminster refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 17 Harley Street London W1G 9QH

    19/04786/ADLBC Submitted 19 Jun 2019 0m away

    Details of quench pipe enclosure pursuant to condition 7 of listed building consent dated 15 March 2019 (RN: 18/10359/LBC);

    Granted Conditions 8 docs
  • 17 Harley Street London W1G 9QH

    19/04785/ADFULL Submitted 19 Jun 2019 0m away

    Details of quench pipe enclosure pursuant to condition 19 of planning permission dated 15 March 2019 (RN: 18/10358/FULL)

    Granted Full applications 8 docs
  • 17 Harley Street London W1G 9QH

    19/03483/ADLBC Submitted 8 May 2019 0m away

    Details of quench pipe enclosure pursuant to condition 7 of listed building consent dated 15 March 2019 (RN: 18/10359/LBC).

    Refused Conditions 8 docs
  • 17 Harley Street London W1G 9QH

    19/02078/ADFULL Submitted 19 Mar 2019 0m away

    Details of Appendix A of the Code of Construction Practice and Construction Management Plan pursuant to condition 10 of planning permission dated: 15 March 2019 (RN: 18/10358/FULL)

    Granted Full applications 10 docs
  • 17 Harley Street London W1G 9QH

    18/05529/LBC Submitted 2 Jul 2018 0m away

    Internal and external alterations including further excavation of basement beneath mews house, alterations to windows and doors and reinstatement of two historic ceilings.

    Withdrawn Heritage and listed buildings Windows or glazing 53 docs
  • First Floor 15 Harley Street London W1G 9QQ

    25/06469/FULL Submitted 10 Sep 2025 12m away

    Re-orientation and screening of an existing air handling unit (AHU) located on the rooftop of the modern rear extension at 15 Harley Street.

    Granted Full applications Extension 32 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications