Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 11 23A Villiers Street London WC2N 6AR

Granted Westminster 12/01385/FULL Application for full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a roof terrace above existing flat roof area at Flat 11.

As published by the council, reference 12/01385/FULL

Application record

Reference
12/01385/FULL
Type
Application for full Planning Permission
Status
Decided
Decision
Application Permitted
Received
8 Feb 2012
Validated
17 May 2012
Decided
12 Jul 2012
Ward
St James's
Decision by
Delegated Decision
Postcode
WC2N 6AR

Timeline

Dates from the published record

  1. 8 Feb 2012

    Received by Westminster

  2. 17 May 2012

    Validated

    Checked as complete and ready for consideration.

  3. 12 Jul 2012

    Decision issued: Application Permitted

  4. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Flat 11 23A Villiers Street London WC2N 6AR

    12/01386/CAC Submitted 8 Feb 2012 0m away

    Construction of a roof terrace at Flat 11.

    Withdrawn Heritage and listed buildings 2 docs
  • Victoria Embankment Gardens Villiers Street London WC2N 6ND

    26/01579/ADV Submitted 11 Mar 2026 10m away

    85% historically approved · decision due ~6 May

    Display of the Lion sculpture for the Pride in the Quarter Trail, from period 1st June 2026 to 10th Auguest 2026.

    Awaiting decision Advertising 4 docs
  • Victoria Embankment Gardens Villiers Street London WC2N 6ND

    26/02039/ADV Submitted 27 Mar 2026 10m away

    85% historically approved · decision due ~22 May

    Display of non-illuminated sculpture measuring 1.1m x 0.9m for a temporary period from 1st June 2026 to 10 August 2026.

    Awaiting decision Advertising 5 docs
  • 8 Buckingham Street London WC2N 6BX

    25/07007/LBC Submitted 30 Sep 2025 16m away

    Proposed repainting of the front elevation.

    Granted Heritage and listed buildings 13 docs
  • 27 John Adam Street London WC2N 6AS

    26/03721/FULL Submitted 8 Jun 2026 20m away

    87% historically approved · decision due ~7 Sep

    Replacement of roof access door. [Linked to 26/02982/LBC]

    Awaiting decision Full applications 12 docs
  • Charing Cross Station Strand London WC2N 5HS

    26/05874/APA Submitted 3 Aug 2026 29m away

    89% historically approved · decision due ~28 Sep

    Prior approval under part 18 (class a) of the town and country planning (general permitted development) (England) order 2015 Villiers Street façade external alterations at London Charing Cross station, WC2N 5HF

    Awaiting decision Prior approval 9 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications