Skip to content
PlanIndex Get alerts
Menu

Planning application

70 Park Lane London W1K 7TT

Granted Westminster 09/03897/ADFULL Approval of Details (Full PP)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of the acoustic enclosure for the air conditioning units pursuant to Condition 1(i) of planning permission granted on appeal APP/X5990/C/08 dated 6 April 2009.

As published by the council, reference 09/03897/ADFULL

Application record

Reference
09/03897/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Application Permitted
Received
15 May 2009
Validated
15 May 2009
Decided
8 Jul 2009
Ward
West End
Decision by
Delegated Decision
Postcode
W1K 7TT

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2007: 1 approved, 3 refused.

  • 08/04402/FULL Refused

    70 Park Lane London W1K 7TT

    Retention of five air conditioning units and installation of an acoustic enclosure on lower level roof in central lightwell.

    Decided 27 Jan 2009 Full applications
  • 07/08254/FULL Refused

    70 Park Lane London W1K 7TT

    Retention of five air conditioning units and installation of an acoustic enclosure on lower level roof in central lightwell.

    Decided 19 Feb 2008 Full applications
  • 07/02784/FULL Refused

    70 Park Lane London W1K 7TT

    Retention of five air conditioning units on lower level roof in rear lightwell.

    Decided 17 Jul 2007 Full applications

Timeline

Dates from the published record

  1. 15 May 2009

    Received by Westminster

  2. 8 Jul 2009

    Decision issued: Application Permitted

  3. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Westminster granted permission on 8 July 2009, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 70 Park Lane London W1K 7TT

    07/08254/FULL Submitted 19 Sep 2007 0m away

    Retention of five air conditioning units and installation of an acoustic enclosure on lower level roof in central lightwell.

    Refused Full applications 10 docs
  • 70 Park Lane London W1K 7TT

    07/02784/FULL Submitted 27 Mar 2007 0m away

    Retention of five air conditioning units on lower level roof in rear lightwell.

    Refused Full applications 8 docs
  • 70 Park Lane London W1K 7TT

    08/04402/FULL Submitted 16 May 2008 0m away

    Retention of five air conditioning units and installation of an acoustic enclosure on lower level roof in central lightwell.

    Refused Full applications 19 docs
  • 2 Park Street London W1K 2XA

    26/00664/FULL Submitted 4 Feb 2026 43m away

    Creation of new ground floor entrance on Park Street, infill of the ground floor entrance on South Street; alterations to elevations, replacement of railings and associated external alterations.

    Granted Full applications Extension 16 docs
  • 61 Park Lane London W1K 1QD

    25/07367/FULL Submitted 13 Oct 2025 48m away

    87% historically approved · decision due ~19 Dec

    Alterations to shopfront including installation of new entrance door.

    Awaiting decision Full applications Windows or glazing 9 docs
  • 77 Park Lane London W1K 7TP

    26/00507/FULL Submitted 28 Jan 2026 59m away

    87% historically approved · decision due ~25 Mar

    Variation of Conditions 1, 6, 7, 10, 21 of planning permission dated 15th July 2024 (RN 23/06850/FULL) for the Use of former car showroom comprising part ground floor, part lower ground floor and basement of building for hotel use (C1), alterations including replacement of roller shutter with louvred pedestrian gate and double door and replacement of car lift entrance with a door and fixed glazed panel (Mount Street frontage), replacement of double door with fixed glazed panels (Park Lane frontage), and installation of plant at ground (by car ramp) and basement levels and in 'Courtyard'/first floor level of central lightwell to Fountain House NAMELY, the addition of further plant and an acoustic enclosure within central lightwell.

    Awaiting decision Full applications Windows or glazing 16 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications