Planning application
08/00762/FULL
1 - 3 Mortimer Street London W1T 3JA
Proposal
Alterations to rear including metal grilles in reinstated pitched roof (at roof level).
As published by the council, reference 08/00762/FULL
Timeline
Dates from the published record
-
21 Jan 2008
Received by Westminster
-
7 Feb 2008
Validated
Checked as complete and ready for consideration.
-
28 Mar 2008
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
18/08099/AD7 Granted
1 - 3 Mortimer Street London W1T 3JA
Display for a temporary period of six months of a non-illuminated estate agent board located on the face of the building at a height of between 3m and 4.6m above pavement level and measuring 1.2m x 0.9m.
-
07/08796/FULL Withdrawn
1 - 3 Mortimer Street London W1T 3JA
Installation of plant at roof level. Installation of new windows on front and rear elevations and new escape ladder on rear elevation.
-
07/03092/FULL Withdrawn
1 - 3 Mortimer Street London W1T 3JA
Erection of mechanical plant enclosure (including lift shaft overrun) at rear third/fourth floor level, replacement of windows and doors, and other alterations including new decking and doors at front ground floor level and new delivery ramp to rear.
-
05/08132/FULL Granted
1 Mortimer Street London W1T 3JA
Use of basement and ground floors as retail (Class A1). [Site includes 1-3 Mortimer Street]
-
06/05856/ADFULL Granted
1 Mortimer Street London W1T 3JA
Details of new tailgate lift and gates on the Berners Mews elevation pursuant to Condition 1 of planning permission dated 20 July 2006 (RN: 06/04110).
-
08/01892/ADFULL Granted
1 Mortimer Street London W1T 3JA
Details of new railings and construction details of new ramp pursuant to Condition 2 of planning permission dated 20 July 2006 (RN: 06/04110)
Other full applications applications
In Westminster
-
26/05054/ADFULL Awaiting decision
82 Margaret Street London W1W 8LH
Detailed planting scheme and an associated biodiversity management plan; pursuant to condition 24 of planning permission dated 10th November 2025 (25/02820/FULL)
-
26/05052/FULL Awaiting decision
23 York Street London W1U 6PF
Internal reconfiguration and refurbishment of the existing residential building to improve the layout of six self-contained flats, together with associated internal alterations, minor external alterations to the rear elevation, replacement of windows and doors where shown, and associated mechanical, electrical and fire safety works. (Linked with 26/05053/LBC)
-
26/05064/ADFULL Awaiting decision
Development Site At 19 To 24 Dering Street London W1S 1BL
Detailed of uperstructure works, detailed plans and elevations of the roof, including the proposed equipment and the layout of photovoltaic (PV) panels pursuant to condition 29 of Planning Permission dated 18th October 2024 (RN:23/07483).
-
26/05069/FULL Awaiting decision
Stanhope House Stanhope Place London W2 2HH
Replacement of balcony balustrade and cornice flashing repairs. (Linked with 26/05070/LBC)
-
26/05078/ADFULL Awaiting decision
63 Blandford Street London W1U 7HR
Details of written photographic specification of the materials; exterior of the new extension; new windows, rooflights, and doors; new roof balustrade to rear; and new solar panels pursuant to conditions 4 and 5 of planning permission dated 03 November 2025 (RN: 25/04449/FULL).