Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Bruton Street London W1J 6QE

Granted Westminster 07/09478/LBC Listed Building Consent Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of six external air conditioning units: four at first floor level within a timber enclosure; one at third floor level and one at fifth floor level.

As published by the council, reference 07/09478/LBC

Application record

Reference
07/09478/LBC
Type
Listed Building Consent Application
Status
Decided
Decision
Application Permitted
Received
31 Oct 2007
Validated
21 Jan 2008
Decided
11 Mar 2008
Ward
West End
Decision by
Delegated Decision
Postcode
W1J 6QE

Site history

Applications at this address on the Westminster register

This site has had 8 applications since 2004: 8 approved, 0 refused.

  • 13/05314/AD7 Granted

    22 Bruton Street London W1J 6QE

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m.

    Decided 25 Jun 2013 Advertising
  • 08/09953/ADV Granted

    22 Bruton Street London W1J 6QE

    Display of an externally illuminated projecting sign.

    Decided 24 Dec 2008 Advertising
  • 07/09477/FULL Granted

    22 Bruton Street London W1J 6QE

    Installation of six external air conditioning units: four at first floor level within a timber enclosure and one at third floor level and one at fifth floor level.

    Decided 11 Mar 2008 Full applications
  • 06/08858/AD7 Granted

    22 Bruton Street London W1J 6QE

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m

    Decided 29 Nov 2006 Advertising
  • 05/04877/AD7 Granted

    22 Bruton Street London W1J 6QE

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m.

    Decided 8 Jul 2005 Advertising
  • 04/07465/AD7 Granted

    22 Bruton Street London W1J 6QE

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6 x 0.45m.

    Decided 29 Sep 2004 Advertising
  • 04/00390/AD7 Granted

    22 Bruton Street London W1J 6QE

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6 x 0.45m.

    Decided 30 Jan 2004 Advertising

Timeline

Dates from the published record

  1. 31 Oct 2007

    Received by Westminster

  2. 21 Jan 2008

    Validated

    Checked as complete and ready for consideration.

  3. 11 Mar 2008

    Decision issued: Application Permitted

  4. 29 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Westminster granted permission on 11 March 2008, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 22 Bruton Street London W1J 6QE

    08/09953/ADV Submitted 17 Nov 2008 0m away

    Display of an externally illuminated projecting sign.

    Granted Advertising 6 docs
  • Third Floor Front 22 Bruton Street London W1J 6QE

    17/04097/LBC Submitted 11 May 2017 0m away

    Removal of partition wall in front office at third floor level.

    Granted Heritage and listed buildings 17 docs
  • 22 Bruton Street London W1J 6QE

    13/05314/AD7 Submitted 5 Jun 2013 0m away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m.

    Granted Advertising 2 docs
  • 22 Bruton Street London W1J 6QE

    07/09477/FULL Submitted 31 Oct 2007 0m away

    Installation of six external air conditioning units: four at first floor level within a timber enclosure and one at third floor level and one at fifth floor level.

    Granted Full applications 7 docs
  • 22 Bruton Street London W1J 6QE

    04/07465/AD7 Submitted 20 Sep 2004 0m away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6 x 0.45m.

    Granted Advertising 4 docs
  • 22 Bruton Street London W1J 6QE

    06/08858/AD7 Submitted 3 Nov 2006 0m away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m

    Granted Advertising 2 docs

In Westminster

  • 26/06025/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06024/FULL)

    3 Sep 2026 Heritage and listed buildings
  • 26/05971/LBC Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Automation of door at principal floor level.

    1 Sep 2026 Heritage and listed buildings
  • 26/05962/LBC Awaiting decision

    Royal Albert Hall Kensington Gore London SW7 2AP

    Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.

    1 Sep 2026 Heritage and listed buildings
  • 26/05970/LBC Awaiting decision

    Norman Shaw Building South Victoria Embankment London SW1A 2HZ

    Replacement and installation of 16 electronic access control systems to Norman Shaw South

    1 Sep 2026 Heritage and listed buildings
  • 26/05943/LBC Awaiting decision

    1 Barton Street London SW1P 3NG

    Use of the building as F1(a) Education, along with associated internal and external alterations. (Linked with 26/05942/FULL)

    1 Sep 2026 Heritage and listed buildings