Planning application
17 Dunraven Street London W1K 7EG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of new railing around lightwell at roof level in connection with use as a terrace.
As published by the council, reference 07/08453/FULL
Application record
- Reference
- 07/08453/FULL
- Type
- Application for full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 26 Sep 2007
- Validated
- 23 Oct 2007
- Decided
- 17 Dec 2007
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1K 7EG
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2007: 2 approved, 0 refused.
-
12/05865/NMA Withdrawn
17 Dunraven Street London W1K 7EG
Amendments to planning permission dated 28 October 2009 (RN:09/07182) for infilling of the rear courtyard at lower ground floor level with glazed access hatch at ground floor level, raising of side boundary walls with adjoining properties by approximately 0.8m Namely to infill of rear courtyard by 3m; removal of fixed rear lights and minor internal alterations to layout.
-
07/07420/LBC Granted
17 Dunraven Street London W1K 7EG
Erection of new railing around lightwell at roof level in connection with use as a terrace.
Timeline
Dates from the published record
-
26 Sep 2007
Received by Westminster
-
23 Oct 2007
Validated
Checked as complete and ready for consideration.
-
17 Dec 2007
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 17 December 2007, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
17 Dunraven Street London W1K 7EG
Erection of new railing around lightwell at roof level in connection with use as a terrace.
Granted Heritage and listed buildings 2 docs -
17 Dunraven Street London W1K 7EG
Amendments to planning permission dated 28 October 2009 (RN:09/07182) for infilling of the rear courtyard at lower ground floor level with glazed access hatch at ground floor level, raising of side boundary walls with adjoining properties by approximately 0.8m Namely to infill of rear courtyard by 3m; removal of fixed rear lights and minor internal alterations to layout.
Withdrawn Amendments Extension Windows or glazing 8 docs -
18 - 19 Dunraven Street London W1K 7FE
Internal alterations at fourth floor level and replacement of window frames at No. 19. Installation of full height extract duct in internal lightwell and at roof level; new rooflight, access hatch and vents at roof level; motorisation of sash windows on all levels; insertion of grills in existing windows in internal lightwell at ground and first floor levels at No. 18.
Granted Heritage and listed buildings Loft or dormer Windows or glazing 3 docs -
12 North Row London W1K 7DF
Installation of an external decked terrace and landscaping to the front of restaurant (retrospective). (Linked with 25/07037/FULL)
Refused Heritage and listed buildings 13 docs -
12 North Row London W1K 7DF
Installation of an external decked terrace and landscaping to the front of restaurant (retrospective). (Linked with 25/07038/LBC)
Refused Full applications 21 docs -
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)