Skip to content
PlanIndex Get alerts
Menu

Planning application

46 Portman Square London W1H 6LZ

Granted Westminster 07/08386/FULL Application for full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of an ATM to shopfront on Orchard Street elevation.

As published by the council, reference 07/08386/FULL

Application record

Reference
07/08386/FULL
Type
Application for full Planning Permission
Status
Decided
Decision
Granted As published: Application Permitted
Received
24 Sep 2007
Validated
12 Oct 2007
Decided
30 Nov 2007
Ward
Marylebone High Street
Decision by
Delegated Decision
Postcode
W1H 6LZ

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2007: 3 approved, 1 refused.

  • 07/06423/FULL Refused

    46 Portman Square London W1H 6LZ

    Installation of an ATM to shopfront on Orchard Street elevation.

    Decided 13 Sep 2007 Full applications
  • 07/05697/ADV Granted

    46 Portman Square London W1H 6LZ

    Display of an externally illuminated projecting sign.

    Decided 17 Jul 2007 Advertising
  • 07/05790/ADV Granted

    46 Portman Square London W1H 6LZ

    Display of spot lit fascia sign (split decision).

    Decided 10 Aug 2007 Advertising

Timeline

Dates from the published record

  1. 24 Sep 2007

    Received by Westminster

  2. 12 Oct 2007

    Validated

    Checked as complete and ready for consideration.

  3. 30 Nov 2007

    Decision issued: Application Permitted

  4. 18 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 30 November 2007, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 46 Portman Square London W1H 6LZ

    07/06423/FULL Submitted 20 Jul 2007 50 yards away

    Installation of an ATM to shopfront on Orchard Street elevation.

    Refused Full applications Windows or glazing 9 docs
  • 46 Portman Square London W1H 6LZ

    07/05697/ADV Submitted 29 Jun 2007 50 yards away

    Display of an externally illuminated projecting sign.

    Granted Advertising 4 docs
  • 46 Portman Square London W1H 6LZ

    07/05790/ADV Submitted 29 Jun 2007 50 yards away

    Display of spot lit fascia sign (split decision).

    Granted Advertising 4 docs
  • 43 - 45 Portman Square London W1H 6LY

    26/02687/NMA Submitted 22 Apr 2026 50 yards away

    93% historically approved · decision due ~17 Jun

    Amendments to planning permission dated 22nd April 2026 (RN:25/06153/FULL) for: Variation of Condition 1 of planning permission dated 7th April 2025 (RN: 24/04987/FULL) for: Partial demolition of the existing roof and removal of plant equipment; construction of a roof extension providing new office (Class E) floorspace with associated external amenity spaces and plant equipment; refurbishment of the existing building, including infilling of the existing atrium; alterations to the existing façade; provision of cycle parking spaces and end of journey facilities, and all associated and ancillary works namely, amendments to mansard roof and rear façades; alterations to skylights and access doors to terraces; alterations to Portman Mews and Orchard Street elevations and to main entrance; alterations to louvres and to internal layout.

    Awaiting decision Amendments Extension Loft or dormer +1 24 docs
  • 43 - 45 Portman Square London W1H 6LY

    06/00987/AD7 Submitted 9 Feb 2006 50 yards away

    Display of non-illuminated estate agent board measuring 600mm x 450mm to be attached to the railings in front of the building at a height of 1.5m from ground floor level, for a temporary period of 6 months.

    Granted Advertising 3 docs
  • 43 - 45 Portman Square London W1H 6LY

    04/09146/AD7 Submitted 18 Nov 2004 50 yards away

    Display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6 x 0.45m.

    Granted Advertising 3 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications