Planning application
07/07714/ADFULL
Central Park Hotel 49 - 67 Queensborough Terrace London W2 3SY
Proposal
Samples of facing materials, including bronze anodised aluminium, glass spandral panel and column cladding; details of new railings and piers, new external doors, new roller shutter to delivery area; revised glazed infill panels in line with existing glazing to south of hotel entrance and planting scheme pursuant to Conditions 1, 3, 4 and 10 of planning permission dated 15 February 2005 (RN: 04/08873).
As published by the council, reference 07/07714/ADFULL
Timeline
Dates from the published record
-
3 Sep 2007
Received by Westminster
-
11 Jan 2008
Decision issued: Application Withdrawn
-
29 Jul 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04151/ADFULL Awaiting decision
Central Park Hotel 49 - 67 Queensborough Terrace London W2 3SY
Details of ventilation for cooking smell mitigation pursuant to condition 12 of planning permission dated 18 March 2024 (RN: 23/08806/FULL)
-
06/02267/FULL Granted
49 - 67 Queensborough Terrace London W2 3SY
Installation of a powder coated dark grey stainless steel gas central heating flue.
-
04/08873/FULL Granted
49 - 67 Queensborough Terrace London W2 3SY
Infilling of existing undercroft/coach parking area with 2 storey extension (ground and mezzanine) to provide 20 additional hotel bedrooms and associated external alterations, new glass canopy.
-
25/01175/ADFULL Awaiting decision
Central Park Hotel 49 - 67 Queensborough Terrace London W2 3SY
Details of samples of the facing materials you will use for the new extension to roof level, including glazing (and including the 'metallic mesh interlayer'), and elevations and roof plans annotated to show where the materials are to be located pursuant to part condition 4 of planning permission dated 19th March 2024 (RN 23/08806/FULL)
-
09/09424/FULL Withdrawn
Central Park Hotel 49 - 67 Queensborough Terrace London W2 3SY
Conversion of the lower basement car park into twenty five additional bedrooms. Erection of new acoustic enclosure at roof level to enclose six air conditioning units.
-
26/03681/ADFULL Awaiting decision
Central Park Hotel 49 - 67 Queensborough Terrace London W2 3SY
Details of amplified sound limiting pursuant to condition 13 of planning permission dated 18 March 2024 (RN: 23/08806/FULL)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.