Planning application
Flat 10 Audley House 9 North Audley Street London W1K 6WF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of air conditioning plant at fifth floor level.
As published by the council, reference 07/00030/FULL
Application record
- Reference
- 07/00030/FULL
- Type
- Application for full Planning Permission
- Status
- Decided
- Decision
- Application Permitted
- Received
- 27 Dec 2006
- Validated
- 1 Feb 2007
- Decided
- 26 Mar 2007
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1K 6WF
Timeline
Dates from the published record
-
27 Dec 2006
Received by Westminster
-
1 Feb 2007
Validated
Checked as complete and ready for consideration.
-
26 Mar 2007
Decision issued: Application Permitted
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 26 March 2007, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
8 Audley House 9 North Audley Street London W1K 6WF
Retention of one air-conditioning unit on gantry at fourth floor level in rear lightwell, installation of acoustic screen. (Site includes 9-10 North Audley Street)
Granted Full applications 9 docs -
8 Audley House 9 North Audley Street London W1K 6WF
Installation of two air conditioning units and maintenance gantry to the rear lightwell of Flat 8 at fourth floor level. (Site includes 9-10 North Audley Street).
Granted Full applications 11 docs -
Flat 4 Audley House 9 North Audley Street London W1K 6WF
Installation of two air conditioning units and a maintenance gantry to the rear lightwell of Flat 4 at second floor level. (Site includes 9-10 North Audley Street).
Granted Full applications 10 docs -
Flat 1 Audley House 9 North Audley Street London W1K 6WF
Installation of an air conditioning unit within the rear lightwell at ground floor level.
Granted Full applications 9 docs -
8 - 10 North Audley Street London W1K 6ZD
87% historically approved · decision due ~3 Apr
Details of waste storage and measures to mitigate the potential increased demand for on-street residents car parking in the vicinity of the site pursuant to condition 2 and 4 of planning permission dated 13 March 2025 (RN: 24/08743/FULL)
Awaiting decision Full applications 8 docs -
8 - 10 North Audley Street London W1K 6ZD
87% historically approved · decision due ~13 Jul
Replacement of the existing external escape staircase and rooflights.
Awaiting decision Full applications Loft or dormer 20 docs
Other full applications
In Westminster
-
26/06024/FULL Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)
-
26/06017/FULL Awaiting decision
38 Lauderdale Mansions Lauderdale Road London W9 1NE
Installation of an external AC Unit / Heat Pump at roof level.
-
26/05938/FULL Awaiting decision
24 Vincent Square London SW1P 2NJ
Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05959/FULL Awaiting decision
Basement And Ground Floor 50 New Bond Street London W1S 1BJ
Installation of three new condensers on the roof, within an existing designated plant area.