Skip to content
PlanIndex Get alerts
Menu

Planning application

149 Oliphant Street London W10 4EA

Granted Westminster 06/09953/FULL Application for full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of existing UPVC double glazed windows and installation of traditional sash box windows.

As published by the council, reference 06/09953/FULL

Application record

Reference
06/09953/FULL
Type
Application for full Planning Permission
Status
Decided
Decision
Application Permitted
Received
12 Dec 2006
Validated
16 Apr 2007
Decided
29 May 2007
Ward
Queen's Park
Decision by
Delegated Decision
Postcode
W10 4EA

Timeline

Dates from the published record

  1. 12 Dec 2006

    Received by Westminster

  2. 16 Apr 2007

    Validated

    Checked as complete and ready for consideration.

  3. 29 May 2007

    Decision issued: Application Permitted

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 153 Oliphant Street London W10 4EA

    25/01037/ADFULL Submitted 14 Feb 2025 0m away

    Detailed drawings of the approved windows and doors pursuant to Condition 5 of planning permission dated 12th February 2025 (RN:24/08380/FULL)

    Granted Full applications Windows or glazing 10 docs
  • 153 Oliphant Street London W10 4EA

    25/00986/ADFULL Submitted 10 Feb 2025 0m away

    87% historically approved · decision due ~11 Apr

    Sample of roof slate; pursuant to Condition 4 of Planning Permission dated 12 February 2025 (RN: 24/08380/FULL).

    Awaiting decision Full applications 3 docs
  • 117 Oliphant Street London W10 4EA

    07/06847/FULL Submitted 3 Aug 2007 0m away

    Installation of two rooflights to the rear elevation.

    Refused Full applications Loft or dormer 8 docs
  • 117 Oliphant Street London W10 4EA

    07/06584/CLOPUD Submitted 26 Jul 2007 0m away

    Erection of single storey side extension to provide additional residential accommodation.

    Granted Lawful development Extension 8 docs
    Small domestic
  • 165 Oliphant Street London W10 4EA

    26/04632/CLOPUD Submitted 10 Jul 2026 0m away

    88% historically approved · decision due ~4 Sep

    Installation of solar panels to generate clean, renewable energy from sunlight and reduce reliance on grid electricity and fossil fuels.

    Awaiting decision Lawful development
  • 145 Oliphant Street London W10 4EA

    12/04532/FULL Submitted 30 Apr 2012 0m away

    Replacement of existing rear ground floor conservatory with new single storey extension with roof lights and associated external alterations.

    Granted Full applications Extension Loft or dormer 6 docs
    Small domestic

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications