Planning application
130 New Bond Street London W1S 2TA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing pilasters with Portland stone pilasters, replacement of existing fascia panels, installation of a halo-illuminated fascia sign and internal alterations at 1st floor level. (Site includes 83-84 Grosvenor Street).
As published by the council, reference 05/09018/LBC
Application record
- Reference
- 05/09018/LBC
- Type
- Listed Building Consent Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 4 Nov 2005
- Validated
- 16 Nov 2005
- Decided
- 10 Jan 2006
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1S 2TA
Site history
Applications at this address on the Westminster register
This site has had 5 applications since 2005: 5 approved, 0 refused.
-
06/00484/ADLBC Granted
130 New Bond Street London W1S 2TA
Details of the new opening in the party wall between No. 130 and 131-134 at first floor level pursuant to Condition 1 of listed building consent dated 10 January 2006 (RN: 05/09018).
-
06/00509/ADFULL Granted
130 New Bond Street London W1S 2TA
Details of the Portland Stone cladding to the pilasters pursuant to Condition 1 of planning permission dated 10 January 2006 (RN 05/09017).
-
05/09017/FULL Granted
130 New Bond Street London W1S 2TA
Replacement of existing pilasters with Portland stone pilasters, and replacement of existing fascia panels with aluminium panels. (Site includes 83-84 Grosvenor Street).
-
05/09019/ADV Granted
130 New Bond Street London W1S 2TA
Display of a halo-illuminated fascia signs
Timeline
Dates from the published record
-
4 Nov 2005
Received by Westminster
-
16 Nov 2005
Validated
Checked as complete and ready for consideration.
-
10 Jan 2006
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 10 January 2006, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
130 New Bond Street London W1S 2TA
Details of the new opening in the party wall between No. 130 and 131-134 at first floor level pursuant to Condition 1 of listed building consent dated 10 January 2006 (RN: 05/09018).
Granted Conditions 4 docs -
130 New Bond Street London W1S 2TA
Details of the Portland Stone cladding to the pilasters pursuant to Condition 1 of planning permission dated 10 January 2006 (RN 05/09017).
Granted Full applications 4 docs -
130 New Bond Street London W1S 2TA
Replacement of existing pilasters with Portland stone pilasters, and replacement of existing fascia panels with aluminium panels. (Site includes 83-84 Grosvenor Street).
Granted Full applications 11 docs -
130 New Bond Street London W1S 2TA
Display of a halo-illuminated fascia signs
Granted Advertising 6 docs -
130 - 134 New Bond Street London
Replacement of two metal windows to the rear elevation. (Linked to 25/05088/FULL)
Granted Heritage and listed buildings Windows or glazing 17 docs -
130 - 134 New Bond Street London
Replacement of two metal windows to the rear elevation at first floor level. (Linked to 25/05089/LBC)
Granted Full applications Windows or glazing 21 docs
Other heritage and listed building applications
In Westminster
-
26/04878/LBC Decided
34 Grosvenor Street London W1K 4QU
Internal works to facilitate the subdivision of 34 Grosvenor Street and 3 Three Kings Yard
-
26/06299/LBC Awaiting decision
Apartment 33 24 Park Crescent London W1B 1AA
Alterations to internal partitions, door openings, doors and floor finishes.
-
26/06305/LBC Awaiting decision
33A Dean Street London W1D 4PP
Installation of new concrete slab with drainage channels at basement level and new fire surround in B.01.
-
26/06318/LBC Awaiting decision
124 Hamilton Terrace London NW8 9UT
Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06317/FULL)
-
26/04141/LBC Decided
80E Randolph Avenue London W9 1BG
Replacement of sashes in two front windows at 2nd floor level and one rear window with slimline double glazed timber sashes. (Linked with 26/04142/FULL)