Skip to content
PlanIndex Get alerts
Menu

Planning application

05/00625/ADFULL

90 - 91 Crawford Street London W1U 6AZ

Decided Westminster Approval of Details (Full PP)

Proposal

Details of management arrangements pursuant to Condition 10 of planning permission dated 09 December 2004 (RN: 03/04690).

As published by the council, reference 05/00625/ADFULL

Timeline

Dates from the published record

  1. 27 Jan 2005

    Received by Westminster

  2. 16 Feb 2005

    Validated

    Checked as complete and ready for consideration.

  3. 31 Dec 2005

    Decision issued: No Further Action

  4. 29 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 04/04103/ADV Granted

    10 - 12 Crawford Street London W1U 6AZ

    Display of illuminated lettering to fascia.

    28 May 2004 0m away Advertising
  • 04/03793/FULL Withdrawn

    10 - 12 Crawford Street London W1U 6AZ

    Installation of fully openable shopfront.

    19 May 2004 0m away Full applications
  • 12/10363/ADFULL Granted

    10-12 Crawford Street London W1U 6AZ

    Samples of the new cladding material and detailed drawings (sections and elevations at a scale no greater than 1:5) showing how the new duct and associated cladding will terminate at the top and any access hatches for maintenance pursuant to Conditions 3 and 4 of planning permission dated 19 June 2012 (RN: 12/01013).

    15 Oct 2012 0m away Full applications
  • 12/01013/FULL Granted

    10-12 Crawford Street London W1U 6AZ

    Removal of rear extractor duct and installation of full height external kitchen extraction ducting to the rear of the building to serve existing restaurant.

    3 Feb 2012 0m away Full applications
  • 03/04690/FULL Granted

    90 - 91 Crawford Street London W1U 6AZ

    Continued use of the parking area on ground floor for the parking/storage of vehicles in association with Express Rent A Car Ltd (sui generis) together with associated acoustic works to the ground floor Crawford Street entrance and front lightwell.

    16 Jun 2003 0m away Full applications
  • 25/08889/AD7 Granted

    100 Gloucester Place London W1U 6HT

    Display for a temporary period of six months of a non-illuminated estate agent board affixed to the front railings and measuring 0.45m x 0.6m (Retrospective)

    8 Dec 2025 30m away Advertising

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications