Planning application
78 Walterton Road London W9 3PQ
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
External alterations including the enlargement of access door to front lightwell, replacement of existing windows and erection of bin stores and new access steps to rear garden.
As published by the council, reference 04/10011/FULL
Application record
- Reference
- 04/10011/FULL
- Type
- Application for full Planning Permission
- Status
- Decided
- Decision
- Application Permitted
- Received
- 17 Dec 2004
- Validated
- 25 Jan 2005
- Decided
- 1 Mar 2005
- Ward
- Harrow Road
- Decision by
- Delegated Decision
- Postcode
- W9 3PQ
Timeline
Dates from the published record
-
17 Dec 2004
Received by Westminster
-
25 Jan 2005
Validated
Checked as complete and ready for consideration.
-
1 Mar 2005
Decision issued: Application Permitted
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22 Abinger Mews W9 3SP
100% historically approved · decision due ~19 Mar
1 x Cherry (front): fell
Awaiting decision Trees 1 doc -
-
20 Abinger Mews W9 3SP
100% historically approved · decision due ~15 Apr
X1 Silver birch: Fell As detailed within the accompanying arboricultural and engineering evidence, the tree is situated approximately 1.8 metres from the property and is exhibiting significant surface rooting typical of Betula pendula. The shallow root system has caused measurable deformation of the tarmacadam driveway, including uplift, cracking, sub base distortion and surface delamination. The independent hard surface and drainage assessment confirms that reinstatement of the driveway to compliant drainage gradients cannot be achieved without excavation within the tree?s root protection area. Due to the garage threshold being set lower than the driveway level, regrading without root removal would create unacceptable flood risk. Pruning has been considered but is not a viable long term solution. Birch species tolerate reduction poorly and significant pruning would accelerate physiological decline without addressing the underlying root conflict. Given the constrained rooting environment, ongoing hard surface displacement and drainage implications, removal and replacement is considered the only sustainable long term solution. We propose to replace the tree with a suitable specimen of approximately 18 to 20 cm e girth, to be positioned appropriately within the site to avoid recurrence of structural conflict while maintaining amenity value. We respectfully request that the application be approved in light of the enclosed technical evidence.
Awaiting decision Trees 8 docs -
9 Abinger Mews W9 3SP
89% historically approved · decision due ~29 Oct
Erection of a single storey rear extension to existing mid-terraced property.
Awaiting decision ExtensionSmall domestic -
178 Shirland Road London W9 3JE
87% historically approved · decision due ~3 Jun
Reinstate stairs to front of property to have external access to basement commercial area and small infill extension to rear.
Awaiting decision Full applications Extension 15 docs -
178 Shirland Road London W9 3JE
87% historically approved · decision due ~4 Aug
Use of basement floor as a flat (Class C3), creation of lightwell with stairs and railings to front elevation and infill extension at rear basement level.
Awaiting decision Full applications Extension 28 docs
Other full applications applications
In Westminster
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05900/FULL Awaiting decision
68 Edgware Road London W2 2EG
Installation of an access hatch window within an existing door to the sites rear elevation fronting Stourcliffe Street to facilitate takeaway collections via Deliveroo from the restaurant. (68-74 Edgware Road).
-
26/05907/FULL Awaiting decision
St Augustines Primary School Kilburn Park Road London NW6 5XA
Installation of district heating network pipework (Phase 1) and installation of individual building connection pipework and associated Glass Reinforced Plastic (GRP) cabinets in connection with the proposed South Kilburn District Heating Network, including associated external and internal works.
-
26/05914/FULL Awaiting decision
66 - 68 Brewer Street London W1F 9TP
Installation of a retractable Dutch-style awning/canopy above the existing Brewer Street doorway. (NB: Venue NAME on canopy, subject to separate advert application.)
-
26/05899/FULL Awaiting decision
Flat 6 39 Wimpole Street London W1G 8YE
Replacement of a painted timber roof top roof light to match existing. (Linked with26/05602/LBC)