Planning application
Gateway Primary School Capland Street London NW8 8LN
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Demolition of parts of walls and reconstruction to match existing.
As published by the council, reference 04/08706/COLBC
Application record
- Reference
- 04/08706/COLBC
- Type
- LBC Applic. Council's Own Dev.
- Status
- Decided
- Decision
- Not required
- Received
- 4 Nov 2004
- Validated
- 4 Nov 2004
- Decided
- 10 Nov 2004
- Ward
- Church Street
- Decision by
- Delegated Decision
- Postcode
- NW8 8LN
Site history
Applications at this address on the Westminster register
This site has had 13 applications since 2004: 10 approved, 0 refused.
-
07/10827/COGADF Granted
Gateway Primary School Capland Street London NW8 8LN
Details of kitchen ventilation and plant pursuant to Condition 11 of planning permission dated 01 February 2007 (RN: 06/08567).
-
07/07980/COGADF Granted
Gateway Primary School Capland Street London NW8 8LN
Details of green walls, roofs and hard and soft landscaping pursuant to Conditions 9 and 14 of planning permission dated 1 February 2007 (RN: 06/08567).
-
07/07406/COGADF Granted
Gateway Primary School Capland Street London NW8 8LN
Details of new gate to Lisson Grove pursuant to Condition 2 of planning permission dated 1 February 2007 (RN: 06/08567).
-
07/07224/COGADF Granted
Gateway Primary School Capland Street London NW8 8LN
Details of facing materials pursuant to Condition 12 (part) of planning permission dated 23 February 2006 (RN: 06/00043).
-
07/04749/COGADF Withdrawn
Gateway Primary School Capland Street London NW8 8LN
Details of hard and soft landscaping and green roofs and walls pursuant to Conditions 9 and 14 of planning permission dated 01 February 2007 (RN: 06/08567).
-
07/02535/COGADF Granted
Gateway Primary School Capland Street London NW8 8LN
Details of travel plan pursuant to Condition 10 of planning permission dated 01 February 2007 (RN: 06/08567).
-
06/08567/COFUL Granted
Gateway Primary School Capland Street London NW8 8LN
Demolition of existing nursery, toilets, caretaker's house and external staircase and creation of four storey extension to primary school accommodating hall, kitchen, classrooms and associated teaching space with green roof. New external toilet block, refuse store and bicycle storage. Amended application from planning permission dated 23 February 2006 (ref: 06/00043/COFUL). Amendments include external fire escape from ground to mezzanine floor to playground elevation; enlargement of rooftop lift/stair plant enclosure, alterations to fenestration; steps and fire escape gate to playground boundary to Lisson Grove. New green roofs and walls.
-
06/08174/COGADF Granted
Gateway Primary School Capland Street London NW8 8LN
Details of brickwork pursuant to Condition 18 of planning permission dated 23 February 2006 (RN: 06/00043).
-
06/00043/COFUL Granted
Gateway Primary School Capland Street London NW8 8LN
Demolition of the nursery, toilets, caretaker's house and external staircase. Construction of four storey extension to the existing primary school accommodating hall, kitchen, classrooms and associated teaching space. Erection of new external toilet block, refuse store and bicycle storage.
-
05/04686/COFUL Withdrawn
Gateway Primary School Capland Street London NW8 8LN
Demolition of the nursery and school keeper's house to allow for the erection of three extensions to the school. Provision of a temporary two storey classroom on the site of the school keeper's house.
Timeline
Dates from the published record
-
4 Nov 2004
Received by Westminster
-
10 Nov 2004
Decision issued: Not required
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Westminster has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Gateway Primary School Capland Street London NW8 8LN
Details of green walls, roofs and hard and soft landscaping pursuant to Conditions 9 and 14 of planning permission dated 1 February 2007 (RN: 06/08567).
Granted Full applications 10 docs -
Gateway Primary School Capland Street London NW8 8LN
Details of new gate to Lisson Grove pursuant to Condition 2 of planning permission dated 1 February 2007 (RN: 06/08567).
Granted Full applications 2 docs -
Gateway Primary School Capland Street London NW8 8LN
Details of facing materials pursuant to Condition 12 (part) of planning permission dated 23 February 2006 (RN: 06/00043).
Granted Full applications 4 docs -
Gateway Primary School Capland Street London NW8 8LN
Details of hard and soft landscaping and green roofs and walls pursuant to Conditions 9 and 14 of planning permission dated 01 February 2007 (RN: 06/08567).
Withdrawn Full applications 1 doc -
Gateway Primary School Capland Street London NW8 8LN
Details of travel plan pursuant to Condition 10 of planning permission dated 01 February 2007 (RN: 06/08567).
Granted Full applications 3 docs -
Gateway Primary School Capland Street London NW8 8LN
Demolition of parts of the brick boundary walls on Capland and Frampton Streets and reconstruction to match the existing.
Granted Full applications Demolition 6 docs
Other heritage and listed building applications
In Westminster
-
26/06025/LBC Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06024/FULL)
-
26/05971/LBC Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Automation of door at principal floor level.
-
26/05962/LBC Awaiting decision
Royal Albert Hall Kensington Gore London SW7 2AP
Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.
-
26/05970/LBC Awaiting decision
Norman Shaw Building South Victoria Embankment London SW1A 2HZ
Replacement and installation of 16 electronic access control systems to Norman Shaw South
-
26/05943/LBC Awaiting decision
1 Barton Street London SW1P 3NG
Use of the building as F1(a) Education, along with associated internal and external alterations. (Linked with 26/05942/FULL)