Skip to content
PlanIndex Get alerts
Menu

Planning application

260 Oxford Street London W1C 1DN

Granted Westminster 04/08091/FULL Application for full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of new shopfront including roller shutter.

As published by the council, reference 04/08091/FULL

Application record

Reference
04/08091/FULL
Type
Application for full Planning Permission
Status
Decided
Decision
Granted As published: Application Permitted
Received
14 Oct 2004
Validated
3 Dec 2004
Decided
25 Jan 2005
Ward
West End
Decision by
Delegated Decision
Postcode
W1C 1DN

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2003: 4 approved, 0 refused.

  • 04/08092/ADV Granted

    260 Oxford Street London W1C 1DN

    Display of internally illuminated (lettering only) fascia sign and projecting sign.

    Decided 25 Jan 2005 Advertising
  • 03/06955/FULL Granted

    260 Oxford Street London W1C 1DN

    Installation of a new shopfront and roller shutter.

    Decided 27 Oct 2003 Full applications
  • 03/06956/ADV Granted

    260 Oxford Street London W1C 1DN

    Display of a fascia and projecting sign (letters illuminated only)

    Decided 27 Oct 2003 Advertising

Timeline

Dates from the published record

  1. 14 Oct 2004

    Received by Westminster

  2. 3 Dec 2004

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jan 2005

    Decision issued: Application Permitted

  4. 18 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 25 January 2005, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 260 Oxford Street London W1C 1DN

    03/06955/FULL Submitted 5 Sep 2003 50 yards away

    Installation of a new shopfront and roller shutter.

    Granted Full applications Windows or glazing 6 docs
  • 260 Oxford Street London W1C 1DN

    03/06956/ADV Submitted 5 Sep 2003 50 yards away

    Display of a fascia and projecting sign (letters illuminated only)

    Granted Advertising 6 docs
  • 260 Oxford Street London W1C 1DN

    04/08092/ADV Submitted 14 Oct 2004 50 yards away

    Display of internally illuminated (lettering only) fascia sign and projecting sign.

    Granted Advertising 5 docs
  • 33 Cavendish Square London W1G 0PS

    25/05480/FULL Submitted 5 Aug 2025 50 yards away

    87% historically approved · decision due ~30 Sep

    Deep retrofit and extension of the existing building and replacement of facade and facade works, deepened basement, and the demolition of part of the existing building to provide a mixed use building comprising: offices (Class E(g)(i)); retail (Class E(a)); flexible retail, restaurant, cafe, leisure and entertainment (Class E(a) and/or Class E(b) and/or Class E(d) and/or sui generis food hall and/or sui generis composite use, comprising competitive socialising including bar use with an extended food and drink offer); flexible cultural and creative floorspace (sui generis composite use, comprising Class F1 and/or Class E(a) and/or Class E (g)(i-iii)); flexible office, retail and destination floorspace (Class E(a) and/or Class E (b) and/or (d) and/or Class E(g)(i) and/or sui generis composite use, comprising visitor destination floorspace viewing gallery with extended food and beverage, bar and leisure offer), replacement public house (sui generis), together with terraces, green roofs, solar voltaic panels and associated works as part of a phased development.

    Awaiting decision Full applications Extension Demolition 199 docs
  • 266 Oxford Street London W1C 1DR

    18/01577/FULL Submitted 23 Feb 2018 50 yards away

    Installation of replacement shopfront.

    Granted Full applications Windows or glazing 13 docs
  • 266 Oxford Street London W1C 1DR

    18/01578/ADV Submitted 23 Feb 2018 50 yards away

    Display of a halo illuminated fascia sign (letters only) measuring 0.78m x 2.14m.

    Granted Advertising 11 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications