Skip to content
PlanIndex Get alerts
Menu

Planning application

03/07230/FULL

15 Frith Street London W1D 4RE

Decided Westminster Application for full Planning Permission

Proposal

External alterations involving low level glazing to the front facade.

As published by the council, reference 03/07230/FULL

Timeline

Dates from the published record

  1. 17 Sep 2003

    Received by Westminster

  2. 1 Dec 2003

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jan 2004

    Decision issued: Not required

  4. 29 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 07/10608/LBC Withdrawn

    15 Frith Street London W1D 4RE

    Removal of internal partition walls and replacement with glass walls and stair balustrade at first, second and third floors.

    5 Dec 2007 0m away Heritage and listed buildings
  • 06/00825/FULL Refused

    15 Frith Street London W1D 4RE

    Installation of replacement air handling unit and extract duct in the rear lightwell.

    3 Feb 2006 0m away Full applications
  • 06/00826/LBC Refused

    15 Frith Street London W1D 4RE

    Internal refurbishment at basement, ground and first floors, installation of replacement air handling unit and extract duct in the rear lightwell.

    3 Feb 2006 0m away Heritage and listed buildings
  • 06/00827/ADV Granted

    15 Frith Street London W1D 4RE

    Display of externally illuminated fascia and projecting signage.

    3 Feb 2006 0m away Advertising
  • 06/06478/LBC Granted

    15 Frith Street London W1D 4RE

    Repainting of existing shopfront.

    11 Aug 2006 0m away Heritage and listed buildings
  • 03/07227/LBC Granted

    15 Frith Street London W1D 4RE

    Creation of an internal fire escape corridor and installation of low level glazing to the front facade.

    17 Sep 2003 0m away Heritage and listed buildings

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.