Planning application
24/01979/FUL
Land South East Of Stone Place Church Road North Leigh Oxfordshire
Proposal
Creation of a new access to field for agricultural purposes, along with laying of a concrete hardstanding and installation of double gates set back from highway
As published by the council, reference 24/01979/FUL
Timeline
Dates from the published record
-
29 Jul 2024
Received by West Oxfordshire
-
29 Aug 2024
Validated
Checked as complete and ready for consideration.
-
13 Nov 2024
Decision issued: Approve
-
30 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21/01816/LBC Granted
Church Farm Cottage Church Road North Leigh Witney Oxfordshire OX29 6TX
Replacement of window with new glazed door and internal addition of doorway to connect workshop area to main house
-
21/02084/HHD Granted
Church Farm House Church Road North Leigh Witney Oxfordshire OX29 6TX
Installation of solar panels covering the south facing roof of the garage
-
24/01046/CLP Withdrawn
Land South East Of Stone Place Church Road North Leigh Oxfordshire
Certificate of Lawfulness (to allow opening of existing gateway, laying of concrete 1.5 wide at highway edge and installation of double gates set back from highway, to include associated splays)
-
23/00342/CND Granted
9 Bridewell Close North Leigh Witney Oxfordshire OX29 6TR
Discharge of condition 6 (Replacement of Tree) of planning permission 22/02707/HHD
-
24/01340/HHD Withdrawn
Field Farm Church Road North Leigh Witney Oxfordshire OX29 6TX
Erection of two-storey extension, replace rear infill extension, internal reconfiguration, replacement glazing, and erection of porch.
-
24/00836/HHD Granted
2 Woodman Cottages New Yatt Road North Leigh Witney Oxfordshire OX29 6TS
(Amended Description) Erection of rear single storey extension
Other full applications applications
In West Oxfordshire
-
26/00787/FUL Granted
Windmill Farm Conference Centre Main Street Clanfield Bampton Oxfordshire OX18 2SN
Construction of lake for non motorised sports activities, construction of hill with caving system, erection of coasteering wall, and associated works
-
26/01125/FUL Granted
The Three Pigeons Inn 31 Woodgreen Witney Oxfordshire OX28 1DG
Replacement of external kitchen extraction unit. (Retrospective).
-
26/01275/FUL Granted
Lord Kitchener Inn Lew Road Curbridge Witney Oxfordshire OX29 7PD
Construction of single storey toilet extension to replace existing.
-
26/01071/FUL Granted
Land South East Of Anvil House Sidings Road Churchill Oxfordshire
Erection of detached garage and vehicle access gate (to serve new dwelling under construction).
-
26/00786/FUL Granted
18 Mavor Close Woodstock Oxfordshire OX20 1YL
Change of use of land to domestic garden and construction of boundary fence (part-retrospective).