Planning application
27 Blacksmiths Hill Aynho OX17 3AH
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non material amendment to WNS/2021/1990/FUL (Proposed garage conversion and extension) Removal of timber cladding to front elevation.
As published by the council, reference WNS/2022/1479/NMA
Application record
- Reference
- WNS/2022/1479/NMA
- Type
- Non Material Amendment to a Planning Permission
- Status
- 10 - Approved
- Decision
- Granted As published: Approval
- Received
- 21 Jul 2022
- Validated
- 22 Jul 2022
- Decided
- 15 Sep 2022
- Ward
- Middleton Cheney
- Parish
- Aynho
- Decision by
- Delegated
- Postcode
- OX17 3AH
Site history
Applications at this address on the West Northamptonshire register
This site has had 4 applications since 2021: 4 approved, 0 refused.
-
2026/1307/TCA Granted
27 Blacksmiths Hill Aynho OX17 3AH
Prunus and Holly tree need removal (TG2 on sketch plan) - 5.4 Metres to house.. Ivy needs removal (C2 on sketch plan) 1 Metre to house.
-
WNS/2022/0843/TCA Granted
27 Blacksmiths Hill Aynho OX17 3AH
G1 - Holly and Magnolia - Removal.
-
WNS/2021/1990/FUL Granted
27 Blacksmiths Hill Aynho OX17 3AH
Proposed garage conversion and extension
Timeline
Dates from the published record
-
21 Jul 2022
Received by West Northamptonshire
-
22 Jul 2022
Validated
Checked as complete and ready for consideration.
-
15 Sep 2022
Decision issued: Approval
-
4 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
West Northamptonshire granted permission on 15 September 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
27 Blacksmiths Hill Aynho OX17 3AH
Prunus and Holly tree need removal (TG2 on sketch plan) - 5.4 Metres to house.. Ivy needs removal (C2 on sketch plan) 1 Metre to house.
Granted Trees 5 docs -
Dove Cottage 15 Blacksmiths Hill Aynho OX17 3AH
Installation of an EV charge point on a small post
Granted Full applications 9 docs -
25 Blacksmiths Hill Aynho OX17 3AH
Single storey rear extension.
Granted Full applications Extension 13 docsSmall domestic -
1 Blacksmiths Hill Aynho OX17 3AH
Ash, multi stemmed, in close proximity to the boundary wall, causing structural damage to the retaining boundary wall. Fell to near ground level.
Granted Trees 3 docsSmall domestic -
21 Blacksmiths Hill Aynho OX17 3AH
Listed building consent for the demolition of an outbuilding within the curtilage of a listed building.
Refused Heritage and listed buildings Demolition 9 docs -
27 Blacksmiths Hill Aynho OX17 3AH
Proposed garage conversion and extension
Granted Full applications Extension 10 docs
Other amendment applications
In West Northamptonshire
-
2026/2973/NMA Granted
96 Balmoral Road Northampton NN2 6JZ
Non material amendment to revise front elevation and alter rear garden stairs to planning permission 2025/0718/FULL (Conversion of a single dwelling house into two separate dwellings)
-
2026/3839/NMA Granted
35 Leah Bank Northampton NN4 8RG
Non material amendment to retain existing window previously proposed for removal, internal layout alterations inc. the relocation of an internal partition wall by approx. 150mm into the adjoining room and relocation of an internal door opening to planning permission 2024/1488/FULL [Proposed first floor side extension].
-
2026/2782/S73 Granted
30 Horton Drive Middleton Cheney OX17 2LN
Variation of condition 3 (materials) to render side extension with white chalk monocouche to planning permission 2025/3828/FULL (Side extension with associated internal works)
-
2026/3403/NMA Granted
1 Naseby Road Clipston LE16 9RZ
Non-material amendment to approved WND/2021/0629 [Single storey side and rear extension] by reversing the location of the new door and window to the side extension so the door is to the rear of the dwelling and the window to the front and replacement of two rooflights with one larger rooflight.
-
2026/2790/S73 Granted
The Blades Helmdon Road Sulgrave OX17 2SQ
Variation of Condition 2 2nd floor front extension and Two storey side extension removed. Second floor loft conversion removed to 2025/2695/FULL (2 storey front, side and rear extension. New second floor and roof alterations. New windows and doors. Chimney reduction).