Planning application
Buttress Ltd The Engine Shed Top Station Road Brackley NN13 7UG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Determination as to whether prior approval is required (under Class J of Part 14 of the above Order) for the installation of 74.26 kWp solar PV equipment on the roof in respect of: design or external appearance of the development in particular the impact of glare on occupiers of neighbouring land
As published by the council, reference WNS/2022/1038/PA
Application record
- Reference
- WNS/2022/1038/PA
- Type
- Prior Approval
- Status
- 10 - Grant of Prior Approval
- Decision
- Prior Approval Granted
- Received
- 25 May 2022
- Validated
- 31 May 2022
- Decided
- 1 Aug 2022
- Ward
- Brackley Ward
- Parish
- Brackley
- Decision by
- Delegated
- Postcode
- NN13 7UG
Timeline
Dates from the published record
-
25 May 2022
Received by West Northamptonshire
-
31 May 2022
Validated
Checked as complete and ready for consideration.
-
1 Aug 2022
Decision issued: Prior Approval Granted
-
5 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
Unit 3 Top Station Road Brackley NN13 7UG
Proposed Rear Extension with Associated Internal and External Works.
Granted Full applications Extension 28 docs -
Unit 2 Top Station Road Brackley NN13 7UG
Proposed Rear Extension with Associated Internal and External Works
Granted Full applications Extension 24 docs -
Central House Top Station Road Brackley NN13 7UG
Tree no 18 tag 459- Corsican Pine - Reduce stem on east side over parking area by approximately 2 metres. Remove dead wood over pavement >20mm in diameter
Granted Trees 7 docs -
4 Valley Close Brackley NN13 7DE
92% historically approved · decision due ~24 Sep
Single storey rear extension.
Awaiting decision Householder Extension 7 docsSmall domestic -
Land East Off The Butts Turweston Road Brackley Northamptonshire NN13 7DD
Condition 11 of WNS/2021/0354/FUL [CMP] Application for approval of details submitted pursuant to Condition 11 of Planning Permission WNS/2021/0354/FUL [Construction of 9no dwellings together with associated access]
Granted Conditions 7 docsSeveral homes -
Land East Off The Butts Turweston Road Brackley Northamptonshire NN13 7DD
Condition 8 of WNS/2021/0354/FUL [Land Contamination Desk Study/Site Walkover] Application for approval of details submitted pursuant to Condition 8 of Planning Permission WNS/2021/0354/FUL [Construction of 9no dwellings together with associated access]
Granted Conditions 6 docsSeveral homes
Other prior approval applications
In West Northamptonshire
-
2026/2724/PA Granted
Grassed verge off Oxford Lane Moreton Pinkney Daventry NN11 3NL
Determination as to whether prior approval is required (under Schedule 2, Part 16, Class A of the above Order) for the installation of a 20m monopole supporting 6 no. antennas, 2 no. 300mm transmission dishes, 2 no. equipment cabinets and ancillary development thereto including 3 no. Ericsson Radio Systems (ERS’s)
-
2026/2600/PNHPD Granted
86 Halse Road Brackley NN13 6EG
Determination as to whether prior approval is required (under Schedule 2, Part 1, Class A of the above Order) for proposed single storey extension extending 6.0m beyond the rear wall of the original dwelling house, maximum height of 3.746m and height at the eaves 2.210m
-
2026/2787/PND Granted
Grange Farm Road To Grange Farm Helmdon NN13 5QF
Determination as to whether prior approval is required (under Schedule 2, Part 6, Class A of the above Order) for the erection of a new agricultural barn.
-
2026/3402/PND Awaiting decision
Adams Barn Preston Capes Road Maidford NN12 8HF
Seeking approval [under schedule 2, part 6, class A of the above order] for the erection of a steel portal-framed agricultural building.
-
2026/2820/PND Granted
Redhill Farm Welford Road Naseby NN6 6DP
Determination as to whether prior approval is required (under Schedule 2, Part 6, Class B of the above Order) for two agricultural storage buildings (no livestock).