Skip to content
PlanIndex Get alerts
Menu

Planning application

22 The Pound Syresham NN13 5HG

Granted West Northamptonshire WNS/2022/0952/FUL Full Planning Permission

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed Single Storey Rear Extension , Loft Conversion with Rear Dormer Extension with Associated Internal and External Works

As published by the council, reference WNS/2022/0952/FUL

Application record

Reference
WNS/2022/0952/FUL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
6 May 2022
Validated
6 May 2022
Decided
9 Sep 2022
Ward
Silverstone
Parish
Syresham
Postcode
NN13 5HG

Timeline

Dates from the published record

  1. 6 May 2022

    Received by West Northamptonshire

  2. 9 Sep 2022

    Decision issued: Approval

  3. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 31 The Pound Syresham NN13 5HG

    2024/4281/LDP Submitted 10 Sep 2024 0m away

    Lawful development certificate (proposed) for dormer loft conversion

    Granted Lawful development Loft or dormer 7 docs
  • 19 Bell Lane Syresham NN13 5HP

    WNS/2022/2376/FUL Submitted 8 Dec 2022 136m away

    Proposed single story rear extension and loft conversion with rear dormer.

    Granted Full applications Extension Loft or dormer 19 docs
  • 30 High Street Syresham NN13 5HL

    2025/4409/FULL Submitted 8 Oct 2025 162m away

    Partial change of use of shop into residential space and retain Post Office. Construction of front canopy.

    Granted Full applications 18 docs
  • 38 High Street Syresham NN13 5HL

    WNS/2022/2357/FUL Submitted 9 Dec 2022 162m away

    Extension over existing garage rear single storey extension and front porch

    Granted Full applications Extension 14 docs
    Small domestic
  • 14 High Street Syresham NN13 5HL

    WNS/2022/1423/FUL Submitted 15 Jul 2022 162m away

    Single storey rear extension

    Granted Full applications Extension 15 docs
    Small domestic
  • The Firs 30 Broad Street Syresham NN13 5HS

    WNS/2022/0451/FUL Submitted 4 Mar 2022 268m away

    Proposed 4 Bed Dwelling

    Granted Full applications 31 docs
    Domestic

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications