Planning application
Land at Lyne Walk Hackleton Northants
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendment to S/2019/1479/MAF (Construction of 21 entry level, affordable homes and associated infrastructure). To amend house type 2307
As published by the council, reference WNS/2022/0945/NMA
Application record
- Reference
- WNS/2022/0945/NMA
- Type
- Non Material Amendment to a Planning Permission
- Status
- 10 - Approved
- Decision
- Granted As published: Approval
- Received
- 16 May 2022
- Validated
- 16 May 2022
- Decided
- 9 Jun 2022
- Ward
- Hackleton and Grange Park
- Parish
- Hackleton
- Decision by
- Delegated
Site history
Applications at this address on the West Northamptonshire register
This site has had 10 applications since 2021: 9 approved, 0 refused.
-
WNS/2022/0972/COND Granted
Land at Lyne Walk Hackleton Northants
Condition 14 of WNS/2019/1479/MAF [ Architectural Detailing] Application for approval of details submitted pursuant to Condition 14 of planning permission WNS/2019/1479/MAF [Construction of 21 entry level, affordable homes and associated infrastructure. ]
-
WNS/2022/0826/COND Granted
Land at Lyne Walk Hackleton Northants
Condition 11 of S/2019/1479/MAF [Scheme of Ownership and Maintenance for Surface Water Drainage] Application for approval of details submitted pursuant to condition 11 of planning permission S/2019/1479/MAF [Construction of 21 entry level affordable homes and associated infrastructure]
-
WNS/2022/0828/COND Granted
Land at Lyne Walk Hackleton Northants
Condition 19 of S/2019/1479/MAF [Landscape Maintenance] Application for approval of details submitted pursuant to condition 19 of planning permission S/2019/1479/MAF [Construction of 21 entry level affordable homes and associated infrastructure]
-
WNS/2022/0825/COND Granted
Land at Lyne Walk Hackleton Northants
Condition 10 of S/2019/1479/MAF [Surface Water Drainage] Application for approval of details submitted pursuant to condition 10 of planning permission S/2019/1479/MAF [Construction of 21 entry level affordable homes and associated infrastructure]
-
WNS/2022/0502/106CD Granted
Land at Lyne Walk Hackleton Northants
Clause 2 of Schedule 2 [Affordable Housing Scheme] Application for approval of details submitted pursuant to Clause 2 of Schedule 2 of the planning obligation relating to planning permission S/2019/1479/MAF [Construction of 21 entry level, affordable homes and associated infrastructure]
-
WNS/2021/1466/COND Withdrawn
Land at Lyne Walk Hackleton Northants
Condition 10 [Surface Water Drainage Scheme] Application for approval of details submitted pursuant to condition 10 of planning permission S/2019/1479/MAF [Construction of 21 entry level, affordable homes and associated infrastructure.]
-
WNS/2021/1282/COND Granted
Land at Lyne Walk Hackleton Northants
Condition 7 [Construction Method Statement] Application for approval of details submitted pursuant to condition 7 of planning permission S/2019/1479/MAF [Construction of 21 entry level, affordable homes and associated infrastructure]
-
WNS/2021/0757/COND Granted
Land at Lyne Walk Hackleton Northants
Condition 16 [Meter Boxes] Application for approval of details submitted pursuant to condition 16 of planning permission S/2019/1479/MAF [ Construction of 21 entry level, affordable homes and associated infrastructure.]
-
WNS/2021/0758/COND Granted
Land at Lyne Walk Hackleton Northants
Condition 23 [System of ducting] Application for approval of details submitted pursuant to condition 23 of planning permission S/2019/1479/MAF [ Construction of 21 entry level, affordable homes and associated infrastructure.]
Timeline
Dates from the published record
-
16 May 2022
Received by West Northamptonshire
-
9 Jun 2022
Decision issued: Approval
-
5 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
West Northamptonshire granted permission on 9 June 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In West Northamptonshire
-
2026/2973/NMA Granted
96 Balmoral Road Northampton NN2 6JZ
Non material amendment to revise front elevation and alter rear garden stairs to planning permission 2025/0718/FULL (Conversion of a single dwelling house into two separate dwellings)
-
2026/3839/NMA Granted
35 Leah Bank Northampton NN4 8RG
Non material amendment to retain existing window previously proposed for removal, internal layout alterations inc. the relocation of an internal partition wall by approx. 150mm into the adjoining room and relocation of an internal door opening to planning permission 2024/1488/FULL [Proposed first floor side extension].
-
2026/2782/S73 Granted
30 Horton Drive Middleton Cheney OX17 2LN
Variation of condition 3 (materials) to render side extension with white chalk monocouche to planning permission 2025/3828/FULL (Side extension with associated internal works)
-
2026/3403/NMA Granted
1 Naseby Road Clipston LE16 9RZ
Non-material amendment to approved WND/2021/0629 [Single storey side and rear extension] by reversing the location of the new door and window to the side extension so the door is to the rear of the dwelling and the window to the front and replacement of two rooflights with one larger rooflight.
-
2026/2790/S73 Granted
The Blades Helmdon Road Sulgrave OX17 2SQ
Variation of Condition 2 2nd floor front extension and Two storey side extension removed. Second floor loft conversion removed to 2025/2695/FULL (2 storey front, side and rear extension. New second floor and roof alterations. New windows and doors. Chimney reduction).