Skip to content
PlanIndex Get alerts
Menu

Planning application

Bridge Stores 1 Towcester Road Old Stratford Northamptonshire MK19 6AN

Granted West Northamptonshire WNS/2022/0698/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

First Floor rear and side extension to provide storage space for shop. Ground floor rear w.c. extension and first floor rear extension to provide office space. (Retrospective)

As published by the council, reference WNS/2022/0698/FUL

Application record

Reference
WNS/2022/0698/FUL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
31 Mar 2022
Validated
31 Mar 2022
Decided
20 Oct 2022
Ward
Deanshanger
Parish
Old Stratford
Decision by
Delegated
Postcode
MK19 6AN

Timeline

Dates from the published record

  1. 31 Mar 2022

    Received by West Northamptonshire

  2. 20 Oct 2022

    Decision issued: Approval

  3. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 36 Towcester Road Old Stratford MK19 6AQ

    WNS/2022/0362/TPO Submitted 22 Feb 2022 91m away

    Crown lift to 2000mm / Remove heavy overhanging bough / 30% overall crown reduction & balancing of tree form

    Granted Trees 8 docs
  • Tree Tops 18 Towcester Road Old Stratford MK19 6AQ

    WNS/2023/0215/TPO Submitted 2 Feb 2023 91m away

    TPO 12/1986 - T1 - Sycamore - Reduce back 1 x Sycamore overhanging roadway drive by 3m to growth points. T2 & T3 - Beech- Reduce back 2 x Beech trees overhanging road drive by 3m to growth points.

    Granted Trees 5 docs
  • 8 Wharf Close Old Stratford MK19 6EH

    WNS/2022/2053/TCA Submitted 25 Oct 2022 99m away

    Remove 2 Silver Birch trees as indicated on the attached plan and replace with 1 Red Hawthorn Tree which will be located in between the 2 removed Silver Birch

    Granted Trees 5 docs
  • 4 Wharf Close Old Stratford MK19 6EH

    WNS/2022/0772/FUL Submitted 11 Apr 2022 99m away

    Conversion existing loft space addition of roof lights and Dormer windows

    Granted Full applications Loft or dormer Windows or glazing 9 docs
  • 4 Wharf Close Old Stratford MK19 6EH

    2025/3666/FULL Submitted 11 Aug 2025 99m away

    Partial change of windows within conservation area.

    Granted Full applications Windows or glazing 10 docs
  • 45 Mounthill Avenue Old Stratford MK19 6AL

    WNS/2022/0591/FUL Submitted 9 Mar 2022 132m away

    Single story rear extension (kitchen and utility) and two-storey side (garage with bedroom and en suite above)

    Granted Full applications Extension 20 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications