Planning application
Land within Hs2 Act limits from a point 250 metres north of Banbury Rd east of Thorpe Mandeville passing through Lower Thorpe to a point, near Culworth Grounds, 20 metres south of PRoW AG9 & 5km west of Culworth.
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Package 4 Works to form the hs2 railway between Thorpe Mandeville and Culworth Grounds; inc Thorpe Mandeville Embankment (Part); Lower Thorpe Viaduct, Lower Thorpe South Embankment; Lower Thorpe South Cutting; Lower Thorpe North Embankment; Lower Thorpe North Cutting (Partf); Culworth Grounds Accommodation Overbridge; retaining wall at Lower Thorpe North Cutting; Culworth Grounds Culvert (above ground elements only); location of the vehicle restraint barriers; 2. drainage ponds; drainage ditches; watercourse diversion of Culworth Brook; earthworks required for the access tracks off Banbury Lane, East and Banbury Lane, West and over Culworth Grounds Overbridge; noise barriers; and the location of permanent (security) fencing. Application for approval of plans and specifications pursuant to Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017
As published by the council, reference WNS/2021/1822/HS2
Application record
- Reference
- WNS/2021/1822/HS2
- Type
- HS2 Sch17 Approval plans and specifications
- Status
- 10 - Approved
- Decision
- Granted As published: Approval
- Received
- 27 Oct 2021
- Validated
- 27 Oct 2021
- Decided
- 14 Feb 2022
- Ward
- Silverstone
- Parish
- Culworth
- Decision by
- Delegated
Timeline
Dates from the published record
-
27 Oct 2021
Received by West Northamptonshire
-
14 Feb 2022
Decision issued: Approval
-
17 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
91 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
West Northamptonshire granted permission on 14 February 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.