Planning application
Land within hs2 Act limits between Trafford Bridge, Edgcote and dismantled railway Aston le Walls,
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Package 6 works to form hs2 railway between Edgcote to Aston Le Walls including • Chipping Warden Green Tunnel Portal North and Chipping Warden Green Tunnel Portal South (‘Porous Portals’); • Chipping Warden Green Tunnel North Portal Building; • Chipping Warden Green Tunnel South Portal Building; • Distribution Network Operator (DNO) Building (located at Chipping Warden Green Tunnel North Portal Compound); • Edgcote Cutting; • Aston le Walls Embankment (Part of); • Earthworks associated with the Chipping Warden Green Tunnel, Chipping Warden North Portal Compound and Chipping Warden Green Tunnel South Portal Compound; • Earthworks associated with the realignment of Culworth Road over Chipping Warden Green Tunnel and new bell mouth and reinstatement of Appletree Lane over Chipping Warden Green Tunnel; • Calves Close Accommodation Access; • Blackgrounds Farm Accommodation Access; • Chipping Warden Green Tunnel North Portal Access Road (off Appletree Lane); • Chipping Warden Green Tunnel South Portal Access Road (off Culworth Road); • 1 No. Drainage Pond; • Drainage Ditches; • Location of the Vehicle Restraint Barriers; and • Location of the permanent (security) fencing. Development authorised by the High Speed Rail (London-West Midlands) Act 2017.
As published by the council, reference WNS/2021/1514/HS2
Application record
- Reference
- WNS/2021/1514/HS2
- Type
- HS2 Sch17 Approval plans and specifications
- Status
- 10 - Approved
- Decision
- Granted As published: Approval
- Received
- 27 Sep 2021
- Validated
- 27 Sep 2021
- Decided
- 28 Feb 2022
- Ward
- Silverstone
- Parish
- Chipping Warden and Edgcote
- Decision by
- Delegated
Site history
Applications at this address on the West Northamptonshire register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
2026/2112/HS2 Granted
Land within hs2 Act limits between Trafford Bridge, Edgcote and dismantled railway Aston le Walls
Approval of a scheme of mitigation for Scheduled Work Nos. 2/111 (in part), 2/127A, 2/128,2/128C, 2/128D and 2/128E relating to SNC P06 R1
-
2026/2113/HS2 Granted
Land within hs2 Act limits between Trafford Bridge, Edgcote and dismantled railway Aston le Walls,
Bring Into Use Scheduled Work Nos. 2/127, 2/127A, 2/128C, 2/128D and 2/128E relating to SNC P06 R1
Timeline
Dates from the published record
-
27 Sep 2021
Received by West Northamptonshire
-
28 Feb 2022
Decision issued: Approval
-
17 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
82 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
West Northamptonshire granted permission on 28 February 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on West Northamptonshire's portal will say. Our guide explains the common types.