Skip to content
PlanIndex Get alerts
Menu

Planning application

183 Watling Street West Towcester NN12 6BX

Granted West Northamptonshire WNS/2021/1389/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Rebuild stone wall which has partially collapsed using matching stone and design as per original. The collapsed part and other parts considered unstable to be rebuilt to a height of 1.8m and stepped to original wall 2.3m.

As published by the council, reference WNS/2021/1389/FUL

Application record

Reference
WNS/2021/1389/FUL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
26 Aug 2021
Validated
3 Sep 2021
Decided
6 Jan 2022
Ward
Towcester and Roade
Parish
Towcester
Decision by
Delegated
Postcode
NN12 6BX

Timeline

Dates from the published record

  1. 26 Aug 2021

    Received by West Northamptonshire

  2. 3 Sep 2021

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jan 2022

    Decision issued: Approval

  4. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Saracens Head Hotel 219 Watling Street West Towcester NN12 6BX

    2024/4110/ADV Submitted 27 Aug 2024 0m away

    Advertisement consent for the installation of 2x non-illuminated wall mounted Corex signs.

    Refused Advertising 13 docs
  • 183 Watling Street West Towcester NN12 6BX

    WNS/2021/1390/LBC Submitted 26 Aug 2021 0m away

    Listed building consent to rebuild stone wall which has partially collapsed using matching stone and design as per original. The collapsed part and other parts considered unstable to be rebuilt to a height of 1.8m and stepped to original wall 2.3m.

    Granted Heritage and listed buildings 14 docs
  • 169 Watling Street West Towcester NN12 6BX

    WNS/2021/0934/LBC Submitted 9 Jul 2021 0m away

    Listed building consent for hanging sign approximately 700 x 700 mm in wood, painted in background dark blue and lettering beige (palette consistent with fascia shop sign already in situ) suspended from bracket already mounted in position on the first floor front wall

    Granted Heritage and listed buildings 10 docs
  • 169 Watling Street West Towcester NN12 6BX

    WNS/2021/0933/ADV Submitted 28 Jun 2021 0m away

    Hanging sign approximately 700 x 700 mm in wood, painted in background dark blue and lettering beige (palette consistent with fascia shop sign already in situ) suspended from bracket already mounted in position on the first floor front wall

    Granted Advertising 11 docs
  • Psp House 167 Watling Street West Towcester NN12 6BX

    2026/2906/FULL Submitted 6 Jul 2026 0m away

    89% historically approved · decision due ~23 Sep

    Change of use from Funeral Directors to Police Office, refurbishment of fittings and replacement signage (existing locations).

    Awaiting decision Full applications 16 docs
  • 185 Watling Street Pub & Kitchen 185 Watling Street West Towcester NN12 6BX

    S/2020/2357/COND Submitted 22 Dec 2020 0m away

    Condition 3 [Noise Levels] Application for approval of details submitted pursuant to Condition 3 of planning permission S/2020/0415/FUL [Retention of existing extraction equipment and external flue (Retrospective); and works to the rear garden including removal of Lawson Cypress, new paving, timber balustrade and timber pergola]

    Granted Conditions 8 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications