Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 17 Wardens Lodge North Street Daventry Northamptonshire NN11 4WL

Granted West Northamptonshire WND/2022/0697 Regulation 3 Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of 4 timber windows with UPVC windows.

As published by the council, reference WND/2022/0697

Application record

Reference
WND/2022/0697
Type
Regulation 3 Planning Permission
Status
10 - Approved
Decision
Approval
Received
27 Jul 2022
Validated
16 Aug 2022
Decided
5 Oct 2022
Ward
Daventry East Ward
Parish
Daventry South3
Decision by
Delegated
Postcode
NN11 4WL

Timeline

Dates from the published record

  1. 27 Jul 2022

    Received by West Northamptonshire

  2. 16 Aug 2022

    Validated

    Checked as complete and ready for consideration.

  3. 5 Oct 2022

    Decision issued: Approval

  4. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Daventry Library Site North Street Daventry Northamptonshire NN11 4GJ

    C/2018/1033/8 Submitted 7 Jun 2022 54m away

    Demolition of existing structures on site and erection of new cinema (Use Class D2 with A3/A4) and restaurants (Use Class A3) and associated infrastructure, engineering, car parking and landscape works. Discharge of Condition 9 - Fume Extraction.

    Decided Conditions Demolition
  • 12 High Street, Daventry NN11 4HT

    2026/0766/LBC Submitted 10 Feb 2026 113m away

    85% historically approved · decision due ~14 May

    Listed building consent to dismantle existing retaining wall, including side elevation of outbuilding, and rebuild as a cavity retaining wall and add fencing over wall to match existing. Lower existing two storey outbuilding to a single storey outbuilding and replace asbestos cement roof with composite slate roof tiles.

    Awaiting decision Heritage and listed buildings Roofing 15 docs
    Small domestic
  • 12 High Street Daventry NN11 4HT

    2026/0765/FULL Submitted 10 Feb 2026 113m away

    89% historically approved · decision due ~14 May

    Dismantle existing retaining wall, including side elevation of outbuilding, and rebuild as a cavity retaining wall and add fencing over wall to match existing. Lower existing two storey outbuilding to a single storey outbuilding and replace asbestos cement roof with composite slate roof tiles.

    Awaiting decision Full applications Roofing 12 docs
    Small domestic
  • 18 High Street, Daventry, NN11 4HT

    2025/4348/LDP Submitted 1 Oct 2025 113m away

    Repair and replacement of 6 internal doors within the Ground and Basement floors

    Granted Lawful development 12 docs
  • Units 2 and 3 Mulberry Place Daventry Northamptonshire NN11 4GU

    WND/2022/0694 Submitted 26 Jul 2022 119m away

    Internally illuminated fascia signage and hanging signs (revised scheme).

    Withdrawn Advertising 4 docs
  • Unit 3 Mulberry Place Daventry Northamptonshire NN11 4GU

    WND/2022/0305 Submitted 1 Apr 2022 119m away

    Internally illuminated fascia signs and internally illuminated projecting/hanging sign

    Granted Advertising 5 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications