Skip to content
PlanIndex Get alerts
Menu

Planning application

Hope House Main Street Badby Northamptonshire NN11 3AN

Granted West Northamptonshire WND/2022/0476 Full Planning Permission

Works: Extension Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing conservatory and pergola. Construction of single storey rear extension, extension to existing porch, replacement windows and construction of garden room.

As published by the council, reference WND/2022/0476

Application record

Reference
WND/2022/0476
Type
Full Planning Permission
Status
10 - Approved
Decision
Granted As published: Approval
Received
23 May 2022
Validated
14 Jun 2022
Decided
8 Aug 2022
Ward
Woodford & Weedon Ward
Parish
Badby
Decision by
Delegated
Postcode
NN11 3AN

Site history

Applications at this address on the West Northamptonshire register

This site has had 2 applications since 2022: 2 approved, 0 refused.

  • Hope House Main Street Badby Northamptonshire NN11 3AN

    Non material amendment to WND/2022/0476- Change of approved window colour from white to light grey

    Decided 19 Apr 2023 Amendments

Timeline

Dates from the published record

  1. 23 May 2022

    Received by West Northamptonshire

  2. 14 Jun 2022

    Validated

    Checked as complete and ready for consideration.

  3. 8 Aug 2022

    Decision issued: Approval

  4. 5 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • Hope House Main Street Badby Northamptonshire NN11 3AN

    Non material amendment to WND/2022/0476- Change of approved window colour from white to light grey

    Decided 19 Apr 2023 Amendments

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

West Northamptonshire granted permission on 8 August 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • The Lilacs Main Street Badby Northamptonshire NN11 3AN

    DA/2020/0598 Submitted 23 Jul 2020 50 yards away

    Works to tree within a conservation area

    Granted Trees 2 docs
  • The Lilacs Main Street Badby NN11 3AN

    2025/3806/TCA Submitted 22 Sep 2025 50 yards away

    Removal of one ash tree with early stage ash dieback and inonotus fungus present. Also pruning works to the large beech tree bordering the neighbouring property, to crown lift the tree to 4 metres, crown clean and lightly prune back15% from property.

    Granted Trees 4 docs
  • Hope House Main Street Badby Northamptonshire NN11 3AN

    WNDNMA/2023/0015 Submitted 17 Mar 2023 50 yards away

    Non material amendment to WND/2022/0476- Change of approved window colour from white to light grey

    Granted Amendments Windows or glazing 6 docs
  • Orchard Bungalow, Main Street, Badby, Northamptonshire NN11 3AN

    2024/3392/PIP Submitted 9 Jul 2024 50 yards away

    Permission in principle for development of up to 4 dwellings (net increase of 3 across the site)

    Granted Outline 15 docs
    Several homes
  • 6 Stoneway Badby Northamptonshire NN11 3AT

    WNNMA/2021/0028 Submitted 16 Jul 2021 50 yards away

    Non material amendment to application DA/2021/0259 apply render to extended garage and porch in lieu of approved brickwork

    Granted Amendments Extension 2 docs
    Small domestic
  • Corner House Stoneway Badby Northamptonshire NN11 3AT

    WND/2022/0971 Submitted 18 Oct 2022 50 yards away

    Demolition of existing extensions and outbuildings. Construction of two storey rear extension, new garage extension with studio above. Minor alterations to existing house and retained outbuildings.

    Granted Full applications Extension Demolition 15 docs

In West Northamptonshire

  • 2025/1917/FULL Granted

    Edgcote Drive Cottages, 2 Wardington Road, Edgcote, OX17 1AG

    Retrospective and proposed alterations to dwelling and associated outbuilding, including removal of unauthorised works and restoration works.

    Received 24 Apr, published by the council 4 Aug 2026 Full applications
  • 2026/1210/FULL Granted

    23 West Cotton Close Northampton NN4 8BX

    Conversion of garage into habitable room (retrospective)

    Received 20 Mar, published by the council 27 Jul 2026 Full applications
  • 2026/2998/FULL Granted

    Jones Wholesale Cash And Carry Heathfield Way Northampton NN5 7QY

    Change of use from Use Class B8 [Storage and Distribution] to Use Class B2 [General Industrial] for the production of stainless steel metal hoses and bellows assemblies.

    Received 13 Jul, published by the council 22 Aug 2026 Full applications
  • 2026/1074/FULL Granted

    Home Farm Cottage Crick Road Watford NN6 7UE

    Change of use of agricultural land to a commercial dog walking field (private hire), including erection of secure boundary fencing and creation of a new vehicular access, together with formation of gravel car parking area to serve the existing livery and associated works- retrospective

    Received 3 Mar, published by the council 4 Aug 2026 Full applications
  • 2026/3377/FULL Granted

    The Greyhound Towcester Road Milton Malsor NN7 3AP

    External alterations including new paving, a new flue, revised car parking layout, new timber posts with lanterns, and associated landscaping works.

    Received 3 Aug, published by the council 4 Sep 2026 Full applications