Skip to content
PlanIndex Get alerts
Menu

Planning application

21 Nether Lane Flore Northamptonshire NN7 4LR

Granted West Northamptonshire WND/2022/0371 Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from office to class C2 for use as children's care home

As published by the council, reference WND/2022/0371

Application record

Reference
WND/2022/0371
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
22 Apr 2022
Validated
26 Apr 2022
Decided
30 Jun 2022
Ward
Long Buckby
Parish
Flore
Decision by
Delegated
Postcode
NN7 4LR

Timeline

Dates from the published record

  1. 22 Apr 2022

    Received by West Northamptonshire

  2. 26 Apr 2022

    Validated

    Checked as complete and ready for consideration.

  3. 30 Jun 2022

    Decision issued: Approval

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Grey Leys 43 Nether Lane Flore NN7 4LR

    2025/3815/TCA Submitted 23 Sep 2025 0m away

    Works to 1x Crab Apple Tree within a conservation area

    Granted Trees 6 docs
  • 15 Chapel Lane Flore NN7 4LF

    2026/2526/HH Submitted 11 Jun 2026 66m away

    92% historically approved · decision due ~28 Sep

    Replacement of existing steel and timber windows with Residence 7 flush casement windows and removal of an existing rear uPVC door with infill and render finish to match the existing dwelling.

    Awaiting decision Householder Extension Windows or glazing 14 docs
    Domestic
  • 11 Chapel Lane Flore NN7 4LF

    2025/4897/FULL Submitted 24 Nov 2025 66m away

    Replacement of 2 ground floor windows

    Granted Full applications Windows or glazing 19 docs
  • Land Adjacent to 20 The Green Flore NN7 4LG

    2024/4104/OUT Submitted 27 Aug 2024 150m away

    Outline application (all matters reserved except access) for the erection of 1no. self-build dwelling

    Refused Outline New dwelling 35 docs
    Domestic
  • 7 The Green Flore NN7 4LG

    2024/2722/FULL Submitted 28 May 2024 150m away

    Replace roof covering on the north (rear) from concrete tile to slate, structural repairs to stabilise outward bowing of the front and rear stone external walls and Installation of tie-bars.

    Granted Full applications Roofing 15 docs
  • 7 The Green Flore NN7 4LG

    2024/2723/LBC Submitted 28 May 2024 150m away

    Replace roof covering on the north (rear) from concrete tile to slate, structural repairs to stabilise outward bowing of the front and rear stone external walls and Installation of tie-bars.

    Granted Heritage and listed buildings Roofing 14 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications