Skip to content
PlanIndex Get alerts
Menu

Planning application

25 Ennerdale Close Daventry Northamptonshire NN11 9EF

Granted West Northamptonshire WND/2022/0318 Full Planning Permission

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing conservatory and covered area. Construction of single storey flat roof side and rear extension.

As published by the council, reference WND/2022/0318

Application record

Reference
WND/2022/0318
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
5 Apr 2022
Validated
11 Apr 2022
Decided
11 Aug 2022
Ward
Daventry West Ward
Parish
Daventry West
Decision by
Delegated
Postcode
NN11 9EF

Timeline

Dates from the published record

  1. 5 Apr 2022

    Received by West Northamptonshire

  2. 11 Apr 2022

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2022

    Decision issued: Approval

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Maple Leaf Garage Braunston Road Daventry NN11 9DY

    2026/2058/FULL Submitted 6 May 2026 158m away

    Above ground rear fuel storage tank, with close boarded 2m high timber fencing (retrospective)

    Granted Full applications 9 docs
  • Maple Leaf Garage Braunston Road Daventry NN11 9DY

    2025/3665/FULL Submitted 11 Aug 2025 158m away

    Additional petrol pump (Retrospective)

    Granted Full applications 30 docs
  • 20 Milton Road Daventry NN11 9DZ

    2026/3175/NMA Submitted 29 Jul 2026 181m away

    Non material amendment to enlarge side window and change to proposed roof to Planning Permission 2025/2751/FULL (Demolition of existing garage and construction of two storey side and single storey rear extension)

    Granted Amendments Extension Demolition +1 15 docs
    Small domestic
  • 17 Milton Road Daventry Northamptonshire NN11 9DZ

    WND/2022/0276 Submitted 24 Mar 2022 181m away

    Demolition of outbuilding and single storey store/utility. Construction of two storey side and single storey rear extension.

    Granted Full applications Extension Demolition 12 docs
    Small domestic
  • 5 Thirlmere Close Daventry NN11 9EG

    2026/0038/FULL Submitted 17 Dec 2025 193m away

    Erection of a single storey rear extension with internal arrangements

    Granted Full applications Extension 10 docs
    Small domestic
  • 5 Thirlmere Close Daventry NN11 9EG

    2026/3437/NMA Submitted 21 Aug 2026 193m away

    94% historically approved · decision due ~16 Oct

    Non material amendment to include a side door into garage to planning permission 2026/0038/FULL (Erection of a single storey rear extension with internal arrangements)

    Awaiting decision Amendments Extension 7 docs
    Small domestic

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications