Planning application

The Old House Holcot Road Walgrave Northamptonshire NN6 9QN

Granted West Northamptonshire WND/2022/0051 Full Planning Permission

Works: Extension Loft or dormer Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of lean-to extension. Construction of single storey extension to existing house via glazed link. Loft conversion with new dormer windows. Modifications to existing outhouse

As published by the council, reference WND/2022/0051

Application record

Reference
WND/2022/0051
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
20 Jan 2022
Validated
30 Mar 2022
Decided
27 Jul 2022
Ward
Moulton Ward
Parish
Walgrave
Decision by
Delegated
Postcode
NN6 9QN

Timeline

Dates from the published record

  1. 20 Jan 2022

    Received by West Northamptonshire

  2. 30 Mar 2022

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2022

    Decision issued: Approval

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Birch Cottage Holcot Road Walgrave Northamptonshire NN6 9QN

    WNNMA/2022/0015 Submitted 1 Mar 2022 0m away

    Non material amendment to application DA/2020/0839 (part single storey and part two storey extension to rear) change of 3 roof/side windows, change colour of windows W10 and W11 to cream

    Granted Amendments Extension Windows or glazing 5 docs
    Small domestic
  • The Old House Holcot Road Walgrave Northamptonshire NN6 9QN

    WND/2022/0052 Submitted 20 Jan 2022 0m away

    Listed building consent for demolition of lean-to extension. Construction of single storey extension to existing house via glazed link. Loft conversion with new dormer windows. Modifications to existing outhouse

    Granted Heritage and listed buildings Extension Loft or dormer +2 22 docs
    Small domestic
  • The Old House, Holcot Road, Walgrave, NN6 9QN

    2025/2360/NMA Submitted 10 Jun 2025 0m away

    Amendment of glazed panels in the extension door set, external trickle vents present in the extension door set, projecting timber cills to all windows, dormer window detailing change and the casement window sits noticeably higher above the roof slope. to approved 2023/5258/FULL and 2023/5260/LBC [Demolition of Lean to Side Extension Replaced with Erection of Single Storey Extension to Existing House via a Glazed Link. Loft Conversion with New Dormer Window. Replacement Fenestration to Main Dwelling.]

    Withdrawn Amendments Extension Loft or dormer +2 8 docs
    Small domestic
  • Land South of Old Road Walgrave NN6 9QW

    2026/1440/PIP Submitted 8 Apr 2026 210m away

    Permission in Principle for up to 3no. new-build dwellings

    Granted Outline New dwelling 9 docs
  • Sedgebrook, Rectory Lane, Walgrave NN6 9QJ

    2026/1292/FULL Submitted 12 Mar 2026 261m away

    Raise existing gables and roof to create habitable loft space with new roof lights and solar panels. New front entrance, and alterations to driveway and hardstanding to front.

    Granted Full applications Loft or dormer Roofing 22 docs
  • The Cottage Gold Street Walgrave NN6 9QE

    2026/0119/FULL Submitted 22 Dec 2025 278m away

    Demolish existing conservatory and part demolish existing single storey rear extension. Construct new two storey rear extension for the improvement of access.

    Granted Full applications Extension Demolition 12 docs
    Small domestic

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications