Planning application
Land Adjacent To The Old Rectory Harlestone Road Church Brampton
Works: New dwelling Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing barn and replacement with detached double garage. Revision of approved 2025/1852/FULL (Construction of self build dwelling and associated works including stopping up of existing access).
As published by the council, reference 2026/2018/FULL
Application record
- Reference
- 2026/2018/FULL
- Type
- Full Planning Permission
- Status
- 10 - Approved
- Decision
- Granted As published: Approval
- Received
- 30 Apr 2026
- Validated
- 30 Apr 2026
- Decided
- 25 Aug 2026
- Ward
- Long Buckby
- Parish
- Church with Chapel Brampton
- Decision by
- Delegated
Site history
Applications at this address on the West Northamptonshire register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
2025/5213/COND Split decision
Land Adjacent To The Old Rectory Harlestone Road Church Brampton
Discharge of Conditions 8 (Biodiversity Enhancements), 9 (Hard & Soft Landscaping), 10 (CEMP) and 11 (Archaeology) of Planning Permission 2025/1852/FULL. (Demolition of the existing agricultural building and construction of a self-build detached dwelling, including the closure of the existing access).
Timeline
Dates from the published record
-
30 Apr 2026
Received by West Northamptonshire
-
27 Jul 2026
Added to PlanIndex
-
25 Aug 2026
Decision issued: Approval
Documents
Plans, drawings, consultee responses and the officer's report
40 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
West Northamptonshire granted permission on 25 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In West Northamptonshire
-
2025/1917/FULL Granted
Edgcote Drive Cottages, 2 Wardington Road, Edgcote, OX17 1AG
Retrospective and proposed alterations to dwelling and associated outbuilding, including removal of unauthorised works and restoration works.
-
2026/1210/FULL Granted
23 West Cotton Close Northampton NN4 8BX
Conversion of garage into habitable room (retrospective)
-
2026/2998/FULL Granted
Jones Wholesale Cash And Carry Heathfield Way Northampton NN5 7QY
Change of use from Use Class B8 [Storage and Distribution] to Use Class B2 [General Industrial] for the production of stainless steel metal hoses and bellows assemblies.
-
2026/1074/FULL Granted
Home Farm Cottage Crick Road Watford NN6 7UE
Change of use of agricultural land to a commercial dog walking field (private hire), including erection of secure boundary fencing and creation of a new vehicular access, together with formation of gravel car parking area to serve the existing livery and associated works- retrospective
-
2026/3377/FULL Granted
The Greyhound Towcester Road Milton Malsor NN7 3AP
External alterations including new paving, a new flue, revised car parking layout, new timber posts with lanterns, and associated landscaping works.