Planning application

28 Underbank Lane Northampton NN3 7HH

Granted West Northamptonshire 2026/0297/FULL Full Planning Permission

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of first floor rear/side extension with flat roof dormer

As published by the council, reference 2026/0297/FULL

Application record

Reference
2026/0297/FULL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
16 Jan 2026
Validated
16 Jan 2026
Decided
30 Apr 2026
Ward
Moulton Ward
Parish
Northampton Town Council
Decision by
Delegated
Postcode
NN3 7HH

Timeline

Dates from the published record

  1. 16 Jan 2026

    Received by West Northamptonshire

  2. 30 Apr 2026

    Decision issued: Approval

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Woodrush Way Northampton NN3 7HU

    2025/4203/FULL Submitted 22 Sep 2025 93m away

    Conversion of existing garage to home office, removal of garage door and replace with window. Change flat garage and porch roof to pitched roof with inclusion of two roof lights

    Granted Full applications Extension Loft or dormer +1 11 docs
    Small domestic
  • 23 Greenfinch Drive Northampton NN3 7HX

    2025/4943/FULL Submitted 17 Nov 2025 220m away

    Proposed garage conversion

    Granted Full applications 8 docs
  • 65A Booth Rise Northampton NN3 6HP

    2025/4022/FULL Submitted 8 Sep 2025 300m away

    Change of use from (Use Class C3) dwellinghouse into a Children's Home (Use Class C2) at 65a Booth Rise, Northampton, NN3 6HP.

    Granted Full applications 21 docs
    Domestic
  • The Leys 63 Booth Rise Northampton NN3 6HP

    2025/5109/FULL Submitted 1 Dec 2025 300m away

    Proposed Change of Use of Class C2 Residential Care Home to a large (Sui-Generis) House in Multiple Occupation (retrospective) for maximum of 32 persons

    Refused Full applications 28 docs
  • 65A Booth Rise Northampton NN3 6HP

    2026/1237/COND Submitted 18 Mar 2026 300m away

    Discharge of Conditions 4 [Cycle Store] and 5 [Refuse Store] of Planning Permission 2025/4022/FULL [Change of use from (Use Class C3) dwellinghouse into a Children's Home (Use Class C2) at 65a Booth Rise, Northampton, NN3 6HP]

    Granted Conditions 5 docs
    Domestic
  • Moulton Fire Station Moulton Way Northampton NN3 6XJ

    2026/2107/COND Submitted 11 May 2026 358m away

    98% historically approved · decision due ~30 Jul

    Discharge of conditions 3 (materials), 6 (demolition and construction management plan), 8 (remediation scheme), 11 (lighting scheme), 14 (security measures), 16 (cycle storage), 17 (travel plan), and 18 (biodiversity net gain plan) of planning permission 2025/1288/MAF (Demolition of Moulton Fire Station, associated structures and two storey standalone building. Repair existing on site fire training tower and smoke house training facility. Construction of 3 storey Fire Station and an associated storage building with vehicle canopy, with associated vehicle parking, and hard and soft landscaping and alterations to the existing vehicles accesses.)

    Awaiting decision Conditions Demolition 16 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications