Planning application

3 Sutton Close, Aston Le Walls, NN11 6UJ

Granted West Northamptonshire 2025/5111/FULL Full Planning Permission

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of conservatory, proposed extension to rear, new entrance porch, raising of flat roof and alterations

As published by the council, reference 2025/5111/FULL

Application record

Reference
2025/5111/FULL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
9 Dec 2025
Validated
10 Dec 2025
Decided
13 Feb 2026
Ward
Rural South Ward
Parish
Aston-Le-Walls
Decision by
Delegated
Postcode
NN11 6UJ

Timeline

Dates from the published record

  1. 9 Dec 2025

    Received by West Northamptonshire

  2. 10 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 13 Feb 2026

    Decision issued: Approval

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Budds Farm Main Street Aston Le Walls NN11 6UF

    2026/2984/PND Submitted 21 Jul 2026 180m away

    91% historically approved · decision due ~13 Oct

    Determination as to whether prior approval is required (under Schedule 2, Part 6, Class A of the above Order) for the erection of a steel frame for storage of agricultural vehicles and animal feed (Hay).

    Awaiting decision Prior approval 7 docs
  • Budds Farm Main Street Aston Le Walls NN11 6UF

    WNS/2022/0536/AGD Submitted 9 Mar 2022 180m away

    Determination as to whether prior approval is required (under Class A of Part 6 of the above Order) for an agricultural building (storage of hay and straw an farm vehicle) in respect of the siting, design and external appearance of the building.

    Granted Prior approval 7 docs
  • Littlestones Main Street Aston Le Walls NN11 6UF

    WNS/2022/1507/TCA Submitted 13 Jul 2022 180m away

    T1 - Ornamental Crab Apple - reduce height by 2.0-2.5m and shape. Remove suckers and ivy.

    Granted Trees 6 docs
  • 15 Plowden Close, Aston Le Walls, Northamptonshire, NN11 6UE

    WNS/2022/2399/FUL Submitted 14 Dec 2022 282m away

    Two storey side extension

    Withdrawn Full applications Extension 19 docs
  • Washbrook Farm Welsh Road Aston Le Walls NN11 6RT

    WNS/2022/1332/MAF Submitted 28 Jun 2022 463m away

    Construction of new all-weather manège and regularisation of existing use of land for equestrian activities.

    Granted Full applications 28 docs
    Major scheme
  • Washbrook Farm Welsh Road, Aston Le Walls, Northamptonshire, NN11 6RT

    WNS/2022/1449/COND Submitted 18 Jul 2022 463m away

    Condition 3 of WNS/2021/0766/MAF [Scheme for Lanscaping] Application for approval of details submitted pursuant to Condition 3 of planning permission WNS/2021/0766/MAF [Construction of equestrian all-weather cross-country course and landscaped earth bund for visual and acoustic screening of HS2 (as amended by plans and additional information received 17/11/21 and 20/12/21).]

    Granted Conditions 8 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications