Planning application
St Anthonys Cottage 2 Elwes Way Northampton NN3 9EA
Works: Loft or dormer Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conversion of a former Church Hall to a two-bedroom dwelling house with associated internal & external alterations, including 1 No. pitched roofed dormer windows and 3 No. conservation-style roof light.
As published by the council, reference 2025/5085/FULL
Application record
- Reference
- 2025/5085/FULL
- Type
- Full Planning Permission
- Status
- 10 - Approved
- Decision
- Approval
- Received
- 27 Nov 2025
- Validated
- 27 Nov 2025
- Decided
- 6 Jul 2026
- Ward
- Billing Ward
- Parish
- Billing Parish Council
- Decision by
- Delegated
- Postcode
- NN3 9EA
Timeline
Dates from the published record
-
27 Nov 2025
Received by West Northamptonshire
-
6 Jul 2026
Decision issued: Approval
-
4 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
17A Manor Lodge Elwes Way Northampton NN3 9EA
Removal of 1x Apple tree due to its impact on nearby stone wall and tree disease. To be replace by a Fig or Pear tree further down the wall.
Granted Trees 10 docs -
Oldways 7 Elwes Way Northampton NN3 9EA
Works to 1x Malus, 1x Cherry, 1x Pine, 1x Mulberry, 1x Birch and 1x Yew within a conservation area
Granted Trees 6 docs -
-
Old Rectory Elwes Way Northampton NN3 9EA
Conversion of detached garage into home study and replacement of roof.
Granted Full applications 17 docs -
3 Elwes Way Northampton NN3 9EA
Ash tree growing within close proximity to a dry stone retaining wall that has collapsed. This tree needs to be removed to be able to repair the wall. To repair the retaining wall, the soil behind needs to be excavated. This will undermine the tree roots which will cause instability.
Granted Trees 11 docs -
Other full applications applications
In West Northamptonshire
-
2026/1962/FULL Refused
19 Deanshanger Road Wicken MK19 6BS
Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage
-
2026/2265/FULL Granted
Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE
Construction of detached concrete garage
-
2026/2062/FULL Granted
4 Paget Close Northampton NN4 7EF
Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear
-
2026/2234/HH Granted
2 Manor Close Deanshanger MK19 6GX
Loft conversion
-
2026/1933/FULL Refused
12 Winchester Road Northampton NN4 8AY
Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.