Planning application
The Burrow The Green Marston St Lawrence OX17 2DB
Works: Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
UPVC purpose built building to provide an extra 6 cabins for temporary short term accommodation of pet cats to include demolition of a dilapidated shed.
As published by the council, reference 2025/4602/FULL
Application record
- Reference
- 2025/4602/FULL
- Type
- Full Planning Permission
- Status
- 10 - Approved
- Decision
- Approval
- Received
- 14 Oct 2025
- Validated
- 11 Nov 2025
- Decided
- 1 Apr 2026
- Ward
- Middleton Cheney
- Parish
- Marston St. Lawrence
- Decision by
- Delegated
- Postcode
- OX17 2DB
Timeline
Dates from the published record
-
14 Oct 2025
Received by West Northamptonshire
-
11 Nov 2025
Validated
Checked as complete and ready for consideration.
-
1 Apr 2026
Decision issued: Approval
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Marston St Lawrence Village Hall Committee Village Hall The Green Marston St Lawrence OX17 2DB
Proposed single storey side extension
Granted Full applications Extension 23 docsSmall domestic -
Marston Inn The Green Marston St Lawrence OX17 2DB
Variation of condition 2 (approved plans) to remove requirement for part of the old The Marston Inn to be reinstated as a public house from planning permission S/2020/2050/FUL (Erection of 5 no. residential dwellings and the refurbishment and extension of existing pub (inc. managers accommodation and a holiday let) and associated works)
Withdrawn Amendments Extension 23 docs -
Stoneacre The Green Marston St Lawrence OX17 2DB
Lawful development certificate (proposed) for construction of detatched garage
Granted Lawful development 10 docs -
Stoneacre The Green Marston St Lawrence OX17 2DB
Proposed new detached garage to store personal classic cars
Refused Full applications 16 docs -
The Rectory/Stoneacre The Green Marston St Lawrence OX17 2DB
Proposed single storey front extension
Granted Full applications Extension 12 docsSmall domestic -
Lane End Farm Road To Lone Cottage Marston St Lawrence OX17 2DB
Change of use from paddock land to garden/residential curtilage
Withdrawn Full applications 8 docs
Other full applications applications
In West Northamptonshire
-
2026/1962/FULL Refused
19 Deanshanger Road Wicken MK19 6BS
Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage
-
2026/2265/FULL Granted
Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE
Construction of detached concrete garage
-
2026/2062/FULL Granted
4 Paget Close Northampton NN4 7EF
Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear
-
2026/2234/HH Granted
2 Manor Close Deanshanger MK19 6GX
Loft conversion
-
2026/1933/FULL Refused
12 Winchester Road Northampton NN4 8AY
Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.