Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Michaelmas Close Middleton Cheney OX17 2GS

Granted West Northamptonshire 2025/4157/FULL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear / side extension and covered rear area (veranda).

As published by the council, reference 2025/4157/FULL

Application record

Reference
2025/4157/FULL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
18 Sep 2025
Validated
29 Sep 2025
Decided
20 Jan 2026
Ward
Middleton Cheney
Parish
Middleton Cheney
Decision by
Delegated
Postcode
OX17 2GS

Timeline

Dates from the published record

  1. 18 Sep 2025

    Received by West Northamptonshire

  2. 29 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jan 2026

    Decision issued: Approval

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3 Michaelmas Close Middleton Cheney OX17 2GS

    WNS/2022/0757/HPD Submitted 20 Apr 2022 0m away

    Determination as to whether prior approval is required (under Class A, Part 1 of the above Order) in respect of the impact on the amenity of any adjoining premises of a proposed single storey rear extension extending 4.40m beyond the rear wall of the original dwelling house, maximum height of 3.15m and height of eaves 2.95m

    Granted Prior approval Extension 7 docs
    Small domestic
  • Croft House 21 Glovers Lane Middleton Cheney OX17 2NU

    2026/1513/TCA Submitted 14 Apr 2026 78m away

    Removal of 4x Silver Birch Trees

    Granted Trees 5 docs
  • 8 Glovers Lane Middleton Cheney OX17 2NU

    2026/3326/S73 Submitted 30 Jul 2026 78m away

    94% historically approved · decision due ~24 Sep

    Variation of condition 2 revised plans to show change of plain clay roof tiles to be replaced with natural slate. To approved 2025/2474/FULL [Part two storey side and part single storey rear extensions]

    Awaiting decision Amendments Extension Roofing 8 docs
    Small domestic
  • Cranmore Cottage 17 Glovers Lane Middleton Cheney OX17 2NU

    2026/1640/TCA Submitted 23 Apr 2026 78m away

    Requesting permission to fully remove the conifer tree. Replanting a small tree in its place.

    Granted Trees 10 docs
  • 18 Glovers Lane, Middleton Cheney, Northamptonshire, OX17 2NU

    WNS/2022/1091/FUL Submitted 26 May 2022 78m away

    Garage conversion

    Granted Full applications 12 docs
  • 15 Glovers Lane Middleton Cheney OX17 2NU

    2026/2281/COND Submitted 28 May 2026 78m away

    98% historically approved · decision due ~23 Jul

    Discharge of Conditions 4 (Windows and Doors), 5 (Roof Lights) and 8 (Location of Bat Boxes) of Planning Permission 2025/0802/FULL. (Single storey rear ground floor extension, first floor rear extension, attic conversion, new rooflights, replacement windows and associated works in accordance with application ref: 2025/0802/FULL).

    Awaiting decision Conditions Extension Loft or dormer +1 11 docs
    Small domestic

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications