Planning application

Land at Halse Road South of Greatworth NN13 6DZ

Awaiting decision West Northamptonshire 2025/2232/FULL Full Planning Permission

Relates to WNS/2022/0557/EIA

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of a DNO access track, temporary construction compound, associated ancillary works and additional planting associated with Copse Lodge Solar Farm (West Northamptonshire Council Reference: WNS/2022/0557/EIA and Planning Appeal Reference: APP/W2845/W/23/3315771).

As published by the council, reference 2025/2232/FULL

Application record

Reference
2025/2232/FULL
Type
Full Planning Permission
Status
4 - Consultations Despatched (1-10)
Received
19 May 2025
Validated
10 Jun 2025
Ward
Rural South Ward
Parish
Greatworth
Decision by
Delegated
Postcode
NN13 6DZ

Timeline

Dates from the published record

  1. 19 May 2025

    Received by West Northamptonshire

  2. 10 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 4 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    West Northamptonshire took a median of 67 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Land at Halse Road, south of Greatworth, Northamptonshire

    Construction of a solar farm and battery stations together with all associated works, equipment and necessary infrastructure

    Decided 26 Oct 2022 Outline

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with West Northamptonshire for determination, against a statutory target of eight weeks. Over the last year West Northamptonshire decided full applications in a median of 101 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications