Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Bramley Close Cogenhoe NN7 1LY

Granted West Northamptonshire 2024/4981/FULL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two storey rear and single storey side/rear extension to include garage conversion.

As published by the council, reference 2024/4981/FULL

Application record

Reference
2024/4981/FULL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
23 Oct 2024
Validated
25 Oct 2024
Decided
11 Dec 2024
Ward
Hackleton and Grange Park
Parish
Cogenhoe & Whiston Parish Council
Decision by
Delegated
Postcode
NN7 1LY

Timeline

Dates from the published record

  1. 23 Oct 2024

    Received by West Northamptonshire

  2. 25 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 11 Dec 2024

    Decision issued: Approval

  4. 22 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20/22 Bramley Close, Cogenhoe, Northamptonshire, NN7 1LY

    WNS/2022/0538/TPO Submitted 2 Mar 2022 0m away

    G1-4 x Pine trees to be reduced by up to 2 metres and removing all deadwood

    Granted Trees 7 docs
  • 4 Bramley Close Cogenhoe NN7 1LY

    2025/3445/TPO Submitted 26 Aug 2025 0m away

    To fell 1x Scots Pine (T2) subject to a TPO Works to 1x Scots Pine (T3) subject to TPO

    Granted Trees 5 docs
  • 8 Bramley Close Cogenhoe NN7 1LY

    WNS/2022/0940/TPO Submitted 4 May 2022 0m away

    T1 - Pine tree to have the lowest 2 limbs removed to raise the crown to approx 3mtrs, to remove back to source the snapped limb and reduce the 2 southern limbs at the very top of the tree by up to 1mtr to bring the crown into a uniform shape.

    Granted Trees 7 docs
  • 7 Victoria Road Cogenhoe NN7 1NE

    2026/2523/HH Submitted 10 Jun 2026 115m away

    92% historically approved · decision due ~5 Aug

    Demolition of conservatory and construction of two storey rear extension including new roof to existing garage

    Awaiting decision Householder Extension Roofing +1 10 docs
    Small domestic
  • 27 Orchard Way Cogenhoe NN7 1LZ

    2026/1114/FULL Submitted 4 Mar 2026 173m away

    Side/ rear garage conversion and extension, and front dormer extension.

    Granted Full applications Extension Loft or dormer 9 docs
  • O/S 52 Orchard Way Cogenhoe NN7 1LZ

    WNS/2023/0316/TLN Submitted 24 Feb 2023 173m away

    Notification of installation of electronic communications to Install 1x 10m light wooden pole (Superfast Broadband)

    Decided Prior approval 5 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications