Planning application
2024/3894/FULL
20 Saddleback Road Northampton NN5 5HL
Proposal
Refurbishment of existing industrial unit. New factory roof, new cladding to office block, new windows, doors and roller shutter together with decorations and internal refurbishment.
As published by the council, reference 2024/3894/FULL
Timeline
Dates from the published record
-
6 Aug 2024
Received by West Northamptonshire
-
15 Aug 2024
Validated
Checked as complete and ready for consideration.
-
30 Oct 2024
Decision issued: Approval
-
4 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2026/2743/COND Granted
39 Duston Road Northampton NN5 5AR
Discharge of Condition 4 (Dormer Materials) of planning permission 2025/5017/FULL (Erection of porch, single storey rear extension and loft conversion with rear box dormer, at: 39 Duston Road, Northampton, NN5 5AR).
-
2026/0827/ADV Granted
Unit C Sixfields Retail Park Gambrel Road Northampton NN5 5BB
Advertisement consent for new illuminated signage fascias.
-
2026/2043/PA Granted
20 Gambrel Road Northampton NN5 5DG
Determination as to whether prior approval is required (under Schedule 2, Part 14, Class J of the above Order) for proposed development comprises a non-domestic, flat roof-mounted solar PV installation of 1512 modules are designed for the system. Each panel is rated at 455W, totaling a system size of 687.96kW
-
2026/1812/FULL Awaiting decision
51 Windsor Crescent Northampton NN5 5AP
Single-storey and two-storey front extension and erection of wall and railings on front and side boundary.
-
2026/2687/TPO Awaiting decision
3 Hawkstone Close Northampton NN5 6RZ
Works to 1x Lime Tree subject to a Tree Preservation Order
-
2026/1836/TPO Granted
53 Hawkstone Close Northampton NN5 6RZ
T8 Dying Lime full removal and replant a suitable broad leaf species
Other full applications applications
In West Northamptonshire
-
2026/1697/FULL Granted
5 The Avenue Dallington Northampton NN5 7AJ
Formation of new shared access driveway for 7a The Avenue, and for the single dwelling approved under application No. WNN/2023/0479
-
2026/1610/FULL Granted
34 Jenner Crescent Northampton NN2 8NB
Demolition of existing conservatory, construction of a smaller single-storey rear extension, garage conversion, and associated roof alteration to the existing utility to align with the pitch of the proposed extension roof.
-
2026/2008/FULL Granted
29 Longmynd Drive Northampton NN5 6DJ
Retrospective decking
-
2026/1747/FULL Granted
14 Cottagewell Court Northampton NN3 9UA
Proposed single storey rear extension and two storey side extension
-
2026/1331/FULL Granted
Heyford Hills Farm Furnace Lane Nether Heyford NN7 3LB
Change of Use to Café with Ancillary Retail Sales, Storage and Parking (Use Class E). Retrospective.