Skip to content
PlanIndex Get alerts
Menu

Planning application

Furrow Hill Farm Abthorpe Road Wappenham NN12 8ST

Granted West Northamptonshire 2024/3004/FULL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion existing domestic stables, side extension and change of use to provide 2 x No C1 accommodation

As published by the council, reference 2024/3004/FULL

Application record

Reference
2024/3004/FULL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
17 Jun 2024
Validated
24 Sep 2024
Decided
13 Nov 2024
Ward
Silverstone
Parish
Wappenham
Decision by
Delegated
Postcode
NN12 8ST

Timeline

Dates from the published record

  1. 17 Jun 2024

    Received by West Northamptonshire

  2. 24 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 13 Nov 2024

    Decision issued: Approval

  4. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Furrow Hill Farm Abthorpe Road Wappenham NN12 8ST

    2026/2799/FULL Submitted 1 Jul 2026 0m away

    89% historically approved · decision due ~21 Sep

    Conversion of Agricultural Barn to One Dwelling, replace existing outbuilding with detached double garage, resurface track road, Parking and Landscaping

    Awaiting decision Full applications 17 docs
    Domestic
  • Furrow Hill Farm Abthorpe Road Wappenham NN12 8ST

    2026/0630/PND Submitted 11 Feb 2026 0m away

    Determination as to whether prior approval is required (under Schedule 2, Part 6, Class A of the above Order) for a general agricultural storage building

    Granted Prior approval 10 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications