Planning application
131 Watling Street West Towcester NN12 6AG
Works: Roofing Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal and external alterations, including replacement windows, new French doors and external doors. Construction of en-suite bathroom to attic and corridor to first floor. Conversion of small garage to gym with new roof. PV panels to large garage. New entrance gates. New fence to boundary.
As published by the council, reference 2024/2364/FULL
Application record
- Reference
- 2024/2364/FULL
- Type
- Full Planning Permission
- Status
- 10 - Approved
- Decision
- Approval
- Received
- 7 May 2024
- Validated
- 7 May 2024
- Decided
- 17 Oct 2024
- Ward
- Towcester and Roade
- Parish
- Towcester
- Decision by
- Delegated
- Postcode
- NN12 6AG
Timeline
Dates from the published record
-
7 May 2024
Received by West Northamptonshire
-
17 Oct 2024
Decision issued: Approval
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
52 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Milestone House 129 Watling Street West Towcester NN12 6AG
Works to 1x pear tree, 1x hawthorn and to fell 1x yew tree, 1x elder and 1x conifer
Granted Trees 5 docs -
131 Watling Street West Towcester NN12 6AG
Listed building consent for internal and external alterations, including replacement windows, new French doors and external doors. Construction of en-suite bathroom to attic and corridor to first floor. Extension to large garage/workshop, conversion of small garage to gym with new roof. PV panels to large garage. New entrance gates. New fence to boundary.
Granted Heritage and listed buildings Extension Roofing +1 54 docsSmall domestic -
61 Watling Street West Towcester NN12 6AG
Condition 3 of WNS/2021/0960/FUL [ Brick Samples ] Application for approval of details submitted pursuant to Condition 3 of planning permission WNS/2021/0960/FUL [Replacement boundary treatment to the front and side boundary of the Old Chapel, 61 Watling Street, Towcester ]
Granted Conditions 6 docs -
81 Watling Street West Towcester NN12 6AG
Listed building consent for replacement of existing front windows with listed building compliant double glazed windows.
Granted Heritage and listed buildings Windows or glazing 20 docs -
131 Watling Street West Towcester NN12 6AG
Discharge of Conditions 3 [Colouring], 4 [Details of Roofing Materials] and 7 [Native Hedgerow Planting] of Planning Permission 2024/2364/FULL [Internal and external alterations, including replacement windows, new French doors and external doors. Construction of en-suite bathroom to attic and corridor to first floor. Conversion of small garage to gym with new roof. PV panels to large garage. New entrance gates. New fence to boundary at 131 Watling Street West Towcester NN12 6AG]
Granted Conditions Roofing Windows or glazing +1 6 docsSmall domestic -
The Day Nursery 6 Watling Street East Towcester NN12 6AF
Listed Building Consent for internal works to outbuilding to create a staff room and office. This consists of constructing stud walls against the internal face of the existing stone walls. Vapour barriers will be installed onto the face of the stone wall, followed by the insulated stud walls which will be finished with plasterboard, plastered, and white paint. Insulation between existing rafters and finished with plaster board, plastered and painted white. Staff WC walls will be battened and finished with tile effect bathroom panels. Internal brick wall separating the Staff WC to the largest unused space will be finished with plasterboard fixed with adhesive, plastered and painted white.
Granted Heritage and listed buildings 16 docs
Other full applications applications
In West Northamptonshire
-
2026/1962/FULL Refused
19 Deanshanger Road Wicken MK19 6BS
Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage
-
2026/2265/FULL Granted
Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE
Construction of detached concrete garage
-
2026/2062/FULL Granted
4 Paget Close Northampton NN4 7EF
Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear
-
2026/2234/HH Granted
2 Manor Close Deanshanger MK19 6GX
Loft conversion
-
2026/1933/FULL Refused
12 Winchester Road Northampton NN4 8AY
Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.