Planning application
25 King Street Bathgate West Lothian EH48 1AZ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of dispensing collection machine
As published by the council, reference 0786/FUL/24
Application record
- Reference
- 0786/FUL/24
- Type
- Planning Application
- Status
- Decided
- Decision
- Grant Planning Permission
- Received
- 9 Oct 2024
- Validated
- 17 Oct 2024
- Decided
- 26 Nov 2024
- Ward
- Bathgate
- Parish
- Bathgate
- Decision by
- Delegated Powers
- Postcode
- EH48 1AZ
Timeline
Dates from the published record
-
9 Oct 2024
Received by West Lothian
-
17 Oct 2024
Validated
Checked as complete and ready for consideration.
-
26 Nov 2024
Decision issued: Grant Planning Permission
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Broxburn
42 applications on PlanIndex · across 7 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
4 King Street Bathgate West Lothian EH48 1AX
Display of 1 illuminated fascia sign, 1 illuminated directory of services sign, 1 illuminated poster sign, 1 window vinyl sign and 1 door opening hours sign
Granted Advertising Windows or glazing 11 docs -
4 King Street Bathgate West Lothian EH48 1AX
Alterations to shopfront to form banking hub
Granted Full applications Windows or glazing 10 docs -
17 George Place Bathgate West Lothian EH48 1NX
Subdivision and part change of use of restaurant to form a restaurant with hot food takeaway (sui generis) and a retail unit(class 1) with associated alterations to building
Granted Full applications 18 docs -
12 Union Road Bathgate West Lothian EH48 1NS
Change of use from house (class 9) to office (class 4)
Granted Full applications 11 docs -
Bathgate Mosque 5 Whitburn Road Bathgate West Lothian EH48 1HE
78% historically approved · decision due ~5 Aug
Change of use of first floor from former mosque (class 10 non-residential institutions) to form 2 flats
Awaiting decision Full applications New dwelling 9 docsSeveral homes -
Royal Scot Court 76 Academy Street Bathgate West Lothian EH48 1QR
78% historically approved · decision due ~24 Sep
Formation of level ramped accesses from the building to the garden area for residents including associated alterations to the building and landscaping works
Awaiting decision Full applications 8 docs
Other full applications applications
In West Lothian
-
0031/FUL/26 Granted
Baird Road And MacIntosh Road Kirkton Campus Livingston West Lothian EH54 7AZ
Erection of a three storey headquarters office building, demolition of four office buildings, extension of gym and development of a storage building, energy centre, solar PV arrays, attenuation ponds, MUGA, sports pitch, landscaping, car parking, cycleways, footpaths and associated works
-
0449/FUL/25 Granted
Fernlea Drumshoreland Pumpherston Broxburn West Lothian EH52 5PF
Erection of a house
-
0546/FUL/26 Granted
Land To South East Of Oaklands Bridgehouse Westfield West Lothian EH48 3DQ
Erection of a horticultural shed for the operation of a plant nursery, including associated storage for landscaping business equipment and materials
-
0494/FUL/26 Granted
Brucefield Park East Brucefield Livingston West Lothian
Erection of 20 small industrial/business start-up units (use classes 4,5 and 6) totalling 1190sqm with associated access, landscaping and boundary enclosure
-
0392/FUL/26 Granted
230 High Street Linlithgow West Lothian EH49 7ES
Painting of shop front