Skip to content
PlanIndex Get alerts
Menu

Planning application

25 King Street Bathgate West Lothian EH48 1AZ

Granted West Lothian 0786/FUL/24 Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of dispensing collection machine

As published by the council, reference 0786/FUL/24

Application record

Reference
0786/FUL/24
Type
Planning Application
Status
Decided
Decision
Grant Planning Permission
Received
9 Oct 2024
Validated
17 Oct 2024
Decided
26 Nov 2024
Ward
Bathgate
Parish
Bathgate
Decision by
Delegated Powers
Postcode
EH48 1AZ

Timeline

Dates from the published record

  1. 9 Oct 2024

    Received by West Lothian

  2. 17 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 26 Nov 2024

    Decision issued: Grant Planning Permission

  4. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Broxburn

42 applications on PlanIndex · across 7 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4 King Street Bathgate West Lothian EH48 1AX

    0435/A/26 Submitted 29 May 2026 125m away

    Display of 1 illuminated fascia sign, 1 illuminated directory of services sign, 1 illuminated poster sign, 1 window vinyl sign and 1 door opening hours sign

    Granted Advertising Windows or glazing 11 docs
  • 4 King Street Bathgate West Lothian EH48 1AX

    0436/FUL/26 Submitted 29 May 2026 125m away

    Alterations to shopfront to form banking hub

    Granted Full applications Windows or glazing 10 docs
  • 17 George Place Bathgate West Lothian EH48 1NX

    0980/FUL/25 Submitted 9 Dec 2025 140m away

    Subdivision and part change of use of restaurant to form a restaurant with hot food takeaway (sui generis) and a retail unit(class 1) with associated alterations to building

    Granted Full applications 18 docs
  • 12 Union Road Bathgate West Lothian EH48 1NS

    1061/FUL/19 Submitted 25 Oct 2019 172m away

    Change of use from house (class 9) to office (class 4)

    Granted Full applications 11 docs
  • Bathgate Mosque 5 Whitburn Road Bathgate West Lothian EH48 1HE

    0460/FUL/26 Submitted 4 Jun 2026 196m away

    78% historically approved · decision due ~5 Aug

    Change of use of first floor from former mosque (class 10 non-residential institutions) to form 2 flats

    Awaiting decision Full applications New dwelling 9 docs
    Several homes
  • Royal Scot Court 76 Academy Street Bathgate West Lothian EH48 1QR

    0555/FUL/26 Submitted 6 Jul 2026 225m away

    78% historically approved · decision due ~24 Sep

    Formation of level ramped accesses from the building to the garden area for residents including associated alterations to the building and landscaping works

    Awaiting decision Full applications 8 docs

In West Lothian

  • 0031/FUL/26 Granted

    Baird Road And MacIntosh Road Kirkton Campus Livingston West Lothian EH54 7AZ

    Erection of a three storey headquarters office building, demolition of four office buildings, extension of gym and development of a storage building, energy centre, solar PV arrays, attenuation ponds, MUGA, sports pitch, landscaping, car parking, cycleways, footpaths and associated works

    16 Jan 2026 Full applications
  • 0449/FUL/25 Granted

    Fernlea Drumshoreland Pumpherston Broxburn West Lothian EH52 5PF

    Erection of a house

    5 Jun 2025 Full applications
  • 0546/FUL/26 Granted

    Land To South East Of Oaklands Bridgehouse Westfield West Lothian EH48 3DQ

    Erection of a horticultural shed for the operation of a plant nursery, including associated storage for landscaping business equipment and materials

    1 Jul 2026 Full applications
  • 0494/FUL/26 Granted

    Brucefield Park East Brucefield Livingston West Lothian

    Erection of 20 small industrial/business start-up units (use classes 4,5 and 6) totalling 1190sqm with associated access, landscaping and boundary enclosure

    15 Jun 2026 Full applications
  • 0392/FUL/26 Granted

    230 High Street Linlithgow West Lothian EH49 7ES

    Painting of shop front

    15 May 2026 Full applications