Skip to content
PlanIndex Get alerts
Menu

Planning application

Poplars Farm Bungalow Owens Lane Downholland Ormskirk Lancashire L39 7HX

Awaiting decision West Lancashire 2026/0730/FUL Full applications

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of two-storey dwelling and outbuilding following the demolition of the existing building.

As published by the council, reference 2026/0730/FUL

Application record

Reference
2026/0730/FUL
Category
Full applications
Status
Registered
Received
1 Sep 2026
Validated
11 Sep 2026
Ward
Rural West Ward
Parish
Downholland
Decision by
Delegated unless Member request to Cttee
Postcode
L39 7HX

Timeline

Dates from the published record

  1. 1 Sep 2026

    Received by West Lancashire

  2. 11 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 14 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    West Lancashire took a median of 71 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • Proposed location, site, street scene and elevations Plans · 11 Sep 2026
  • Drainage statement Miscellaneous · 11 Sep 2026
  • Planning statement/volume calcs Miscellaneous · 10 Sep 2026
  • Site location, existing site layout, floor and elevations Plans · 01 Sep 2026
  • Proposed site, floor and elevation plans Plans · 01 Sep 2026
  • Arboricultural implications assessment Miscellaneous · 01 Sep 2026
  • Arboricultural method statement Miscellaneous · 01 Sep 2026
  • Dusk survey results Miscellaneous · 01 Sep 2026
  • Inspection & assessment in relation to bats & breeding birds Miscellaneous · 01 Sep 2026
  • Application form Application Form · 01 Sep 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with West Lancashire for determination, against a statutory target of eight weeks. Over the last year West Lancashire decided full applications in a median of 82 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In West Lancashire

  • 2026/0779/FUL Awaiting decision

    164J Ormskirk Road Up Holland Skelmersdale Lancashire WN8 0AB

    Proposed detached garage to the side of the existing house following the demolition of the existing prefabricated garage.

    16 Sep 2026 Full applications
  • 2026/0783/FUL Awaiting decision

    Littlefield Parbold Hill Parbold Wigan Lancashire WN8 7TG

    2 Storey side extension to replace existing conservatory and internal amendments with some amendments to fenestration at the rear and a new stove.

    16 Sep 2026 Full applications
  • 2026/0769/FUL Awaiting decision

    22 Cromwell Close Aughton Ormskirk Lancashire L39 5ET

    First floor extension above existing utility/garage

    14 Sep 2026 Full applications
  • 2026/0764/FUL Awaiting decision

    Kennels Wellcross Farm 123 Tower Hill Road Up Holland Skelmersdale Lancashire WN8 0DT

    Proposed change of use of Existing Access Track to Provide Vehicular Access to the Approved Dog Exercise Field

    11 Sep 2026 Full applications
  • 2026/0763/FUL Awaiting decision

    Kennels Wellcross Farm 123 Tower Hill Road Up Holland Skelmersdale Lancashire WN8 0DT

    Proposed alterations and extension to an existing kennel building, including the provision of a new pitched roof and erection of a new 13-compartment kennel building.

    11 Sep 2026 Full applications