Skip to content
PlanIndex Get alerts
Menu

Planning application

8 Robbery Bottom Lane Welwyn AL6 0UW

Awaiting decision Welwyn Hatfield 6/2026/1436/FULL FULL PERMISSION

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of two 2-bed chalet bungalows (Use Class C3) following the subdivision of existing residential plot

As published by the council, reference 6/2026/1436/FULL

Application record

Reference
6/2026/1436/FULL
Type
FULL PERMISSION
Status
Under Consultation
Received
14 Aug 2026
Validated
14 Aug 2026
Ward
Welwyn East
Parish
Welwyn
Decision by
Delegated
Postcode
AL6 0UW

Comment by 24 September 2026

The council is taking comments on this application until then. Comments go to Welwyn Hatfield through their own planning portal.

Timeline

Dates from the published record

  1. 14 Aug 2026

    Received by Welwyn Hatfield

  2. 7 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Welwyn Hatfield took a median of 58 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Welwyn Hatfield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Oaklands Rise Welwyn AL6 0RG

    6/2021/2069/TPO Submitted 8 Jul 2021 70m away

    T1 Oak, reduce crown up to 3m/back to previous reduction points T2-T8, Sweet chestnut x4 and Hornbeam x3, cut back to boundary line of 1 Chestnut Walk to height of 6m, reduce above 6m from ground level by 1-2m to reduce overhang, no cuts to be made beyond the boundary line. T9, Hornbeam, cut back to boundary line of 1 Chestnut Walk to height of 6m to clear telephone lines.

    Granted Trees
  • 11A Chestnut Walk Welwyn AL6 0SB

    6/2023/0170/HOUSE Submitted 24 Jan 2023 109m away

    Erection of new rear dormer extension as continuation of existing rear dormer

    Refused Householder Extension Loft or dormer
    Domestic
  • 5A Oaklands Rise Welwyn

    6/2019/2797/TPO Submitted 5 Nov 2019 114m away

    Reduce 1x Oak tree by 20% (TPO 672)

    Granted Trees
  • 26 Lower Mardley Hill Welwyn AL6 0UQ

    6/2021/0972/HOUSE Submitted 25 Mar 2021 117m away

    Erection of two storey side and rear extensions and a first floor rear extension, insertion of 6 x side facing dormer windows and 3 x side facing roof lights to facilitate extension of existing first floor plan. Alterations to fenestration on existing front, side and rear elevations and demolition of outbuilding attached to existing garage, to facilitate erection of new detached outbuilding.

    Refused Householder Extension Loft or dormer +2
    Small domestic
  • 14 Lower Mardley Hill Welwyn AL6 0SQ

    6/2022/2500/TPO Submitted 1 Nov 2022 127m away

    Remove sweet chestnut T6, T7, T8, T9, T10, T11, T12, T13 and replace with oak. Remove scots pine T14, T15, T16 and replace with oak. All trees covered by TPO 879 (2022) & 203 (1995).

    Refused Trees
  • 19 Robbery Bottom Lane Welwyn AL6 0UL

    6/2021/1409/HOUSE Submitted 4 May 2021 137m away

    Demolition of existing rear terrace and construction of part side, part rear double storey extension with associated dormer windows and single storey front extension.

    Granted Householder Extension Loft or dormer +2
    Small domestic

In Welwyn Hatfield

  • Old Owen's Sports Ground Coopers Lane Potters Bar EN6 4NF

    Installation of 1 no. single padel court

    27 May 2026 Full applications
  • 6/2026/0740/FULL Withdrawn

    Land to the rear of 8 Birds Close Welwyn Garden City AL7 4AR

    Erection of a single storey detached dwelling with basement

    27 Apr 2026 Full applications
  • 6/2026/1231/FULL Withdrawn

    St Johns Church Of England Jmi School Lemsford Village Lemsford Welwyn Garden City AL8 7TR

    Installation of new fencing and gates across the school boundary adjacent to the main road

    13 Jul 2026 Full applications
  • 15 Tiger Moth Way Hatfield AL10 9LT

    Change of use of general amenity land to residential garden and erection of a 2 metre high timber boundary fence following removal of existing hedge and boundary treatment

    1 Jun 2026 Full applications
  • Warren Lodge Stables Great North Road Hatfield AL9 5JX

    Change of use of land to use as a Gypsy/Traveller caravan site, comprising 9 pitches each accommodating two caravans, including no more than one static caravan/mobile home per pitch, together with the laying of hardstanding and erection of acoustic fence

    19 Feb 2026 Full applications